Skip to content
Worcester State University

WSU 26-10 Parking Garage Repairs

Solicitation: BD-26-1113-1113C-1113L-125204
Notice ID: ma_commbuys_dad0c4f4ed2a805562c9
Source codes72, 12, 11, 30, 15, 00, 32, 70DepartmentWorcester State UniversityAgency1113CONVD - Worcester State UniversityStateMAPostedFeb 09, 2026, 12:06 PM UTCDueMar 11, 2026, 02:00 PM UTCExpiredBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from 1113CONVD - Worcester State University • Worcester State University. Place of performance: MA. Response deadline: Mar 11, 2026. Industry: Source industry codes 72, 12, 11, 30, 15, 00, 32, 70.

Source
Open on official portal →
Solicitation
BD-26-1113-1113C-1113L-125204
Performance
Chandler Street Worcester, MA 01602
Response
Mar 11, 2026, 02:00 PM UTC
Open on official portal →
Map for MA
Live POP
Place of performance
Chandler Street Worcester, MA 01602
State: MA
Contracting office
Central Receiving/Stockroom 486 Chandler Street Worcester, MA 01602 US

Point of Contact

Name
WSU Bids Desk
Email
Not available
Phone
Not available

Agency & Office

Department
Worcester State University
Agency
1113CONVD - Worcester State University
Subagency
1113CONVD - Worcester State University
Office
1113L - WSU Campus
Contracting Office Address
Central Receiving/Stockroom 486 Chandler Street Worcester, MA 01602 US

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260006 (Rev 2)
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
7 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 5 more rate previews.
Davis-BaconBest fitstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD
Davis-Baconstate match
MA20260025 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Worcester
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260001 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
TOR/ASBESTOS WORKER (ZONE B) ZONE B- BARNSTABLE COUNTY (BARNSTABLE, BOURNE, FALMOUTH, MASHPEE, SANDWICH), BRISTOL COUNTY (ALL CITIES EXCEPT EASTON),AND NORFOLK COUNTY (BELLINGHAM, FRANKLIN, PLAINVILLE)
Base $55.45Fringe $36.63
Rate
OOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBOROUGH, HOLBROOK, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHAM, NORFOLK, NORWOOD, QUINCY, RANDOLPH, SHARON, STOUGHTON, WALPOLE, WELLESLEY, WESTWOOD, WEYMOUTH)
Base $55.45Fringe $36.63
Rate
URO, WELLFLEET AND YARMOUTH); BRISTOL (EASTON); ESSEX; MIDDLESEX; NORFOLK (AVON, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, HOLBROOK, HULL, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHA
Base $55.45Fringe $36.63
+87 more occupation rates in this WD

Description

Worcester State University is soliciting proposals for the following: WSU 26-10 Parking Garage Repairs. Please log in to projectdog.com and search for project # 872161.

Advisory bid range

Pricing and bid posture

medium confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,474,911
Sector total $3,515,474,911 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,474,911)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 18, 2026
Client-ready brief
Executive summary
high confidencegpt 4o mini

Worcester State University is seeking proposals for the WSU 26-10 Parking Garage Repairs, with a response deadline set for March 11, 2026. Interested parties need to log in to projectdog.com to access project details under #872161. This opportunity presents a target for firms with experience in parking facility renovation and repair projects.

Worcester State UniversityParking Garage RepairsConstruction BidFacility Renovationsource codes 72, 12, 11, 30, 15, 00
What the buyer is trying to do

The buyer aims to select a qualified contractor to perform necessary repairs for the parking garage at Worcester State University, ensuring the facility meets safety and usability standards.

Who should pursue this
  • Contractors specializing in parking facility repairs
  • Construction firms with prior experience in similar projects
  • Bidders with a proven safety record in construction
Work breakdown
  • Assessment of existing parking garage conditions
  • Preparation of detailed repair plans
  • Execution of parking garage repairs
  • Compliance with safety regulations during project execution
  • Final inspection and approval process
Response package checklist
  • Completed proposal form
  • Company qualifications and relevant project experience
  • Schedule of proposed repairs
  • Cost estimate
  • Warranty terms for work performed
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adherence to local safety regulations is mandatory
  • Compliance with all Massachusetts construction codes
Pricing strategy
  • Consider competitive pricing while ensuring quality of repairs
  • Itemize costs for transparency and easier comparison
Teaming and subs
  • Consider teaming with structural engineers for specialized assessments
  • Use local subcontractors to meet community engagement goals
Risks and watchouts
  • Potential delays due to unforeseen structural issues
  • Budget overruns if repairs exceed initial assessments
  • Regulatory compliance issues leading to project stoppages
Smart questions to ask
  • What specific repairs are most critical for project success?
  • Are there any existing reports on the structural condition of the garage?
  • What is the expected timeline for project completion once commenced?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specifics on the types of repairs needed
  • No details on the budget range for the project
  • Lack of information regarding any previous assessments of the garage
  • No contact information for the project manager
  • No historical performance data on contracted repairs
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1113-1113C-1113L-125204
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.