Davis-Bacon
KS20260162 (Rev 1)
Coverage: Kansas • Butler, Harvey, Sumner.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ELECTRICIAN | $40.64 | $18.29 |
| LINE CONSTRUCTION: LINEMAN | $53.68 | $26.44 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.57 | $21.69 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $39.57 | $21.69 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.57 | $21.69 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $36.09 | $16.83 |
| IRONWORKER | $39.00 | $34.25 |
| CEMENT MASON/CONCRETE FINISHER | $39.06 | $18.71 |
| TRUCK DRIVER: DUMP TRUCK | $24.95 | $9.62 |
| OPERATOR: ROLLER | $31.50 | $16.88 |
| OPERATOR: LOADER | $21.09 | $4.03 |
| OPERATOR: CRANE | $29.82 | $6.41 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.79 | $6.84 |
| LABORER: PIPELAYER | $16.03 | $2.88 |
| LABORER: COMMON OR GENERAL | $16.26 | $3.61 |
| CARPENTER, EXCLUDES FORM WORK | $24.15 | $6.18 |
| CARPENTER (FORM WORK ONLY) | $19.56 | $3.12 |