Skip to content
City and Borough of Juneau

Bids & RFPs

Solicitation: Not available
Notice ID: 06db52f774d87b09863bb0d21e534544
DepartmentCity and Borough of JuneauStateAKPostedMay 26, 2026, 12:00 AM UTCDueNo due date postedBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from City and Borough of Juneau. Place of performance: AK.

Source
Open on official portal →
Solicitation
06db52f774d87b09863bb0d21e534544
Performance
Juneau, AK
Response
No due date posted
Open on official portal →
Map for AK
Live POP
Place of performance
Juneau, AK
State: AK
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
City and Borough of Juneau
Agency
Not available
Subagency
Not available
Office
Finance - Purchasing
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
AK20260001 (Rev 1)
Published May 18, 2026Alaska • Aleutians East, Aleutians West, Anchorage +20
73 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 71 more rate previews.
Davis-BaconBest fitstate match
AK20260001 (Rev 1)
Open WD
Published May 18, 2026Alaska • Aleutians East, Aleutians West, Anchorage +20
Rate
TERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS)
Base $37.38Fringe $19.55
Rate
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS)
Base $41.35Fringe $16.46
Rate
BOILERMAKER
Base $58.33Fringe $28.79
+70 more occupation rates in this WD
Davis-Baconstate match
AK20260005 (Rev 1)
Open WD
Published May 18, 2026Alaska • Aleutians East, Aleutians West, Bethel +12
Rate
PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM
Base $58.55Fringe $29.50
Rate
PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM
Base $48.47Fringe $29.50
Rate
PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM
Base $56.60Fringe $29.50
+39 more occupation rates in this WD
Davis-Baconstate match
AK20260006 (Rev 1)
Open WD
Published May 18, 2026Alaska • Aleutians East, Aleutians West, Anchorage +20
Rate
TRUCK DRIVER: Group 5
Base $47.62Fringe $29.42
Rate
TRUCK DRIVER: Group 4
Base $48.50Fringe $29.42
Rate
TRUCK DRIVER: Group 3
Base $49.17Fringe $29.42
+37 more occupation rates in this WD
Davis-Baconstate match
AK20260004 (Rev 1)
Open WD
Published May 18, 2026Alaska • Anchorage
Rate
SHEET METAL WORKER (INCLUDING HVAC DUCT)
Base $23.21Fringe $0.00
Rate
ROOFER (EXCLUDING SHAKES/SHINGLES)
Base $13.13Fringe $0.00
Rate
POWER EQUIPMENT OPERATORS: (EXCAVATOR)
Base $20.50Fringe $0.00
+15 more occupation rates in this WD

Description

Open Solicitations Your browser does not support iframes. Closed Solicitations Your browser does not support iframes.

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.