Skip to content
Federal Bid Partners LLCProposal & grant writing, plus GSA Schedules
St

Bid 2026.12 LWI Reserve Relief Homewood Pump Station Replacement and Drainage Improvement

Solicitation: 12588523
Notice ID: 10b4c10491a478c63f8272d74c318b76
DepartmentStStateLAPostedMay 20, 2026, 12:00 AM UTCDueJun 22, 2026, 04:00 AM UTCCloses in 10 daysBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from St. John the Baptist Parish Government. Place of performance: LA. Response deadline: Jun 22, 2026.

Source
Open on official portal →
Solicitation
12588523
Performance
LA, US
Response
Jun 22, 2026, 04:00 AM UTC
Open on official portal →
Live POP
Place of performance
LA, US
State: US
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
St. John the Baptist Parish Government
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
LA20260027 (Rev 1)
Published May 18, 2026Louisiana • Catahoula, Claiborne, East Carroll +9
11 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 9 more rate previews.
Davis-BaconBest fitstate match
LA20260027 (Rev 1)
Open WD
Published May 18, 2026Louisiana • Catahoula, Claiborne, East Carroll +9
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $32.66Fringe $9.86
Rate
ELECTRICIAN
Base $29.55Fringe $14.36
Rate
PLUMBER (INCLUDING HVAC PIPE INSTALLATION)
Base $31.00Fringe $15.35
+8 more occupation rates in this WD
Davis-Baconstate match
LA20260017 (Rev 1)
Open WD
Published May 18, 2026Louisiana • Assumption
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $32.66Fringe $9.86
Rate
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)
Base $31.98Fringe $15.14
Rate
PLUMBER (INCLUDING HVAC PIPE INSTALLATION)
Base $26.50Fringe $13.39
+10 more occupation rates in this WD
Davis-Baconstate match
LA20260016 (Rev 1)
Open WD
Published May 18, 2026Louisiana • Allen
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $32.66Fringe $9.86
Rate
ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING)
Base $31.98Fringe $15.14
Rate
PLUMBER (INCLUDING HVAC PIPE INSTALLATION)
Base $26.50Fringe $13.39
+9 more occupation rates in this WD
Davis-Baconstate match
LA20260044 (Rev 2)
Open WD
Published May 18, 2026Louisiana • St Tammany
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $32.66Fringe $9.86
Rate
ELECTRICIAN (COMMUNICATION TECHNICIAN AND LOW VOLTAGE WIRING ONLY)
Base $36.00Fringe $16.66
Rate
ELECTRICIAN (EXCLUDING COMMUNICATION TECHNICIAN AND LOW VOLTAGE WIRING)
Base $30.35Fringe $12.46
+20 more occupation rates in this WD

Description

A Mandatory Pre-Bid Conference will be held for Reserve Relief Homewood Pump Station Replacement and Drainage Improvements at St. John the Baptist Parish Council Chambers located at 1811 W. Airline Highway, Laplace, LA 70068, on June 9, 2026, at 10:00 A.M. Site visit will occur immediately following the mandatory pre-bid meeting at the site referenced above.

Advisory bid range

Pricing and bid posture

high confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,217,899,737
Sector total $2,217,899,737 • Share 100.0%
Live
Median
$153,150
P10–P90
$30,083$4,589,258
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,217,899,737)
Deal sizing
$153,150 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice 12588523
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.