Skip to content
Department of Environmental Protection

AMRP, Sandy Cr No 1, Covington Tp, Clearfield Cnty

Solicitation: OSM 17(0115,6422)103.1
Notice ID: 12cd8495f69dfefdb2e6d4a11ad1dec6
DepartmentDepartment of Environmental ProtectionStatePAPostedFeb 20, 2026, 12:00 AM UTCDueMar 19, 2026, 06:00 PM UTCExpiredBid range$1,125,122 - $1,333,478
Contract snapshot

Federal opportunity from Department of Environmental Protection. Place of performance: PA. Response deadline: Mar 19, 2026.

Source
Open on official portal →
Solicitation
OSM 17(0115,6422)103.1
Performance
Clearfield County, PA
Response
Mar 19, 2026, 06:00 PM UTC
Open on official portal →
Map for PA
Live POP
Place of performance
Clearfield County, PA
State: PA
Contracting office
Not listed

Point of Contact

Name
Construction Contracts
Email
RA-ConstructionContr@pa.gov
Phone
717-787-7820

Agency & Office

Department
Department of Environmental Protection
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match • county match
PA20260029 (Rev 1)
Published May 18, 2026Pennsylvania • Cameron, Clearfield, Clinton +4
12 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 10 more rate previews.
Davis-BaconBest fitstate match • county match
PA20260029 (Rev 1)
Open WD
Published May 18, 2026Pennsylvania • Cameron, Clearfield, Clinton +4
Rate
BRICKLAYER (CLINTON COUNTY)
Base $36.53Fringe $18.09
Rate
BRICKLAYER (CLEARFIELD COUNTY)
Base $34.14Fringe $22.77
Rate
BRICKLAYER (CAMERON, ELK, MCKEAN,POTTER AND WARREN COUNTIES:)
Base $31.62Fringe $22.81
+9 more occupation rates in this WD
Davis-Baconstate match • county match
PA20260047 (Rev 2)
Open WD
Published May 18, 2026Pennsylvania • Clearfield
Rate
BOILERMAKER
Base $48.28Fringe $33.17
Rate
TILE SETTER
Base $35.64Fringe $21.63
Rate
TILE FINISHER
Base $28.76Fringe $17.16
+28 more occupation rates in this WD
Davis-Baconstate match
PA20260089 (Rev 4)
Open WD
Published May 18, 2026Pennsylvania • Fayette
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION AND INDUSTRIAL WORK (INCLUDING DUCT AND PIPE))
Base $46.50Fringe $29.43
Rate
BOILERMAKER
Base $48.28Fringe $33.17
Rate
TILE SETTER
Base $35.64Fringe $21.63
+32 more occupation rates in this WD
Davis-Baconstate match
PA20260051 (Rev 3)
Open WD
Published May 18, 2026Pennsylvania • Forest
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (INDUSTRIAL; MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION)
Base $46.50Fringe $29.43
Rate
BOILERMAKER
Base $48.28Fringe $33.17
Rate
TILE SETTER
Base $35.64Fringe $21.63
+39 more occupation rates in this WD

Description

The principal items of work and approximate quantities are:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance, 2 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter), 8,197 L.F.
Clearing and Grubbing, 157.6 ACRE
Grading – Grading Area 1, 1,649,134 C.Y.
Grading – Grading Area 2, 81,0003 C.Y.
Grading – Hummocky Piles, 6.3 ACRE
Grading – Ripping, 32.2 ACRE
Planting – Planting Preparation, 157.6 ACRE
Planting – Tree Seedlings, 26,172 EACH
Planting – Mulching, 119.1 ACRE
Beginning on the Issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.

Advisory bid range

Pricing and bid posture

high confidence
$1,125,122 - $1,333,478

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$1,125,122
Target
$1,190,605
Premium
$1,333,478
Labor
$343,304
Direct
$408,200
Burden
$270,703
Fee + reserve
$140,318
Target $1,190,605Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,524,600,184
Sector total $3,524,600,184 • Share 100.0%
Live
Median
$350,000
P10–P90
$31,970$3,446,688
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,524,600,184)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 16, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

This opportunity is for the implementation of an Erosion and Sediment Pollution Control Plan under solicitation number OSM 17(0115,6422)103.1, issued by the Department of Environmental Protection. The project involves significant earthworks including grading over 1.6 million cubic yards and planting over 26,000 tree seedlings. Proposals are due on March 19, 2026, providing a tight timeline for preparation and submission.

erosion controlenvironmental remediationgrading projectsediment controlland restoration
What the buyer is trying to do

The buyer aims to control erosion and sediment pollution through extensive grading and planting efforts in Clearfield County, Pennsylvania.

Who should pursue this
  • Contractors with experience in environmental remediation and erosion control
  • Firms with capabilities in large-scale grading operations
  • Companies specializing in forestry or landscape restoration
Work breakdown
  • Implement Erosion and Sediment Pollution Control Plan – Rock Construction Entrance (2 units)
  • Implement Erosion and Sediment Pollution Control Plan – Compost Filter Sock (8,197 linear feet)
  • Clearing and Grubbing (157.6 acres)
  • Grading – Grading Area 1 (1,649,134 cubic yards)
  • Grading – Grading Area 2 (81,000 cubic yards)
  • Grading – Hummocky Piles (6.3 acres)
  • Grading – Ripping (32.2 acres)
  • Planting Preparation (157.6 acres)
  • Plant Tree Seedlings (26,172 units)
  • Planting – Mulching (119.1 acres)
Response package checklist
  • Completed bid form
  • Proof of relevant experience and expertise
  • Environmental certifications
  • Project timeline and scheduling
  • Bid pricing details
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Compliance with state environmental regulations is required.
  • Bidders must adhere to the specifications set forth in the bid documents.
Pricing strategy
  • Competitive pricing is crucial given the scale of physical work required.
  • Consideration for material costs associated with planting and earthworks.
Teaming and subs
  • Consider partnering with local environmental specialists and subcontractors with specific experience in sediment control and planting.
  • Potential to team with logistics firms for material transport.
Risks and watchouts
  • Timing constraints with a short proposal period (less than a month).
  • Risk of underestimating the quantity of materials needed for grading and planting.
  • Compliance risks related to environmental regulations.
Smart questions to ask
  • What specific environmental permits are required for this project?
  • Are there any existing contracts or partnerships that could affect bidding?
  • What is the projected timeline for the start of work after award?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specifics on the site location or access conditions.
  • No details on potential subcontracting rules or limitations.
  • Lack of information on previous contracts or performance requirements.
  • No indications of funding or budget constraints.
  • No insights into competition or bidding history.
  • No criteria for evaluation of proposals.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice OSM 17(0115,6422)103.1
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.