Skip to content
New Mexico Public School Facilities Authority

Division 00 – 6363: Change Order

Solicitation: Not available
Notice ID: 15137ca36b3de9f5f7f50d383049b953
Contract snapshot

Federal opportunity from New Mexico Public School Facilities Authority. Place of performance: NM.

Source
Open on official portal →
Solicitation
15137ca36b3de9f5f7f50d383049b953
Performance
New Mexico
Response
No due date posted
Open on official portal →
Live POP
Place of performance
New Mexico
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
New Mexico Public School Facilities Authority
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
NM20260013 (Rev 1)
Published May 18, 2026New Mexico • Catron
41 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 39 more rate previews.
Davis-BaconBest fitstate match
NM20260013 (Rev 1)
Open WD
Published May 18, 2026New Mexico • Catron
Rate
CARPENTER (METAL STUD INSTALLATION ONLY)
Base $29.09Fringe $16.20
Rate
ABOVE ZONE 1 RATE
Base $40.30Fringe $13.41
Rate
POWER EQUIPMENT OPERATOR ((8) CRANE)
Base $31.43Fringe $4.65
+38 more occupation rates in this WD
Davis-Baconstate match
NM20260049 (Rev 1)
Open WD
Published May 18, 2026New Mexico • Torrance, Valencia
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $36.66Fringe $11.83
Rate
CARPENTER (INCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND METAL STUD INSTALLATION (EXCLUDES FORM WORK))
Base $24.08Fringe $10.79
Rate
ELECTRICIAN
Base $40.30Fringe $13.41
+14 more occupation rates in this WD
Davis-Baconstate match
NM20260025 (Rev 1)
Open WD
Published May 18, 2026New Mexico • Otero
Rate
CARPENTER (METAL STUD INSTALLATION ONLY)
Base $24.08Fringe $10.79
Rate
ELECTRICIAN (EXCLUDING LOW VOLTAGE WIRING FOR ALARMS)
Base $38.00Fringe $9.82
Rate
POWER EQUIPMENT OPERATOR ((8) CRANE)
Base $31.43Fringe $4.65
+39 more occupation rates in this WD
Davis-Baconstate match
NM20260044 (Rev 1)
Open WD
Published May 18, 2026New Mexico • Bernalillo
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $36.66Fringe $11.83
Rate
CARPENTER (INCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND METAL STUD INSTALLATION (EXCLUDES FORM WORK))
Base $24.08Fringe $10.79
Rate
ELECTRICIAN
Base $40.30Fringe $13.41
+15 more occupation rates in this WD

Description

Division 00 – 6363: Change Order

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,516,281,615
Sector total $3,516,281,615 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,459$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,516,281,615)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.