2026 Water Main Repairs
Federal opportunity from Public Agency. Place of performance: United States.
- Source
- Open on official portal →
- Solicitation
- 05ymT6w5OauD6XIWN4KP
- Performance
- United States
- Response
- No due date posted
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
Description
The City of Columbus, Department of Public Utilities, is receiving bids for construction services for the 2026 Water Main Repairs Project. The project involves providing labor and equipment to complete repairs to water mains and water taps at various locations within the Columbus Water Distribution System on an as-needed basis.
* Bids are to be submitted only through Bid Express at www.bidexpress.com.
* Hard copies or emails will not be accepted.
* A pre-bid meeting will not be held.
* Al... | Title: 2026 Water Main Repairs, Agency: City of Columbus, State: Ohio, Open Date: 3/9/2026, Close Date: 4/1/2026, Last Updated Date: 4/1/2026
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The City of Columbus is seeking bids for the 2026 Water Main Repairs Project, with a focus on labor and equipment to repair water mains and taps across the city. Bids must be submitted via Bid Express, as hard copies or emails will not be accepted. This project opens on March 9, 2026, and closes on April 1, 2026.
The City of Columbus aims to perform necessary repairs to its water distribution system effectively and efficiently to maintain water service reliability.
- General contractors with experience in municipal water systems
- Companies that can provide both labor and equipment
- Labor for repairing water mains
- Equipment provision for repairs
- Water tap repairs at various locations
- Completed bid form via Bid Express
- Proof of experience in similar projects
- List of equipment available for use
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Bids must be exclusively submitted through Bid Express
- Compliance with local construction regulations is required
- Consider competitive pricing within the local market for public utility projects
- Include a breakdown of costs for labor and equipment separately
- Form partnerships with local subcontractors experienced in plumbing or excavation
- Incorporate suppliers who can provide reliable equipment for the repairs
- Potential delays in equipment availability affecting project timelines
- Changes in local regulations that may impact construction processes
- Are there specific locations that require immediate attention within the project?
- What is the anticipated volume of repairs needed during the contract period?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific locations for repairs within the Columbus Water Distribution System
- Detailed funding or budget constraints related to the project
- Clarity on any potential incentives for early project completion
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.