Skip to content
State of Mississippi

BID: 352-20260515092248 MDT

Solicitation: Not available
Notice ID: 2c0dfa2f22ebfe53fb51c3b220384fd3
DepartmentState of MississippiStateMSPostedJun 19, 2026, 12:00 AM UTCDueNo due date postedBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from State of Mississippi. Place of performance: MS.

Source
Open on official portal →
Solicitation
2c0dfa2f22ebfe53fb51c3b220384fd3
Performance
Mississippi
Response
No due date posted
Open on official portal →
Live POP
Place of performance
Mississippi
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
State of Mississippi
Agency
Not available
Subagency
Not available
Office
Department of Finance and Administration
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MS20260007 (Rev 1)
Published May 18, 2026Mississippi • Clay
13 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 11 more rate previews.
Davis-BaconBest fitstate match
MS20260007 (Rev 1)
Open WD
Published May 18, 2026Mississippi • Clay
Rate
TRUCK DRIVER: DUMP TRUCK
Base $8.65Fringe $0.00
Rate
ROOFER, INCLUDES SHAKE & SHINGLE ROOFS
Base $11.16Fringe $0.00
Rate
PLUMBER
Base $11.75Fringe $0.00
+10 more occupation rates in this WD
Davis-Baconstate match
MS20260042 (Rev 2)
Open WD
Published May 18, 2026Mississippi • Smith
Rate
ELECTRICIAN
Base $33.30Fringe $11.63
Rate
PLUMBER (INCLUDES HVAC PIPE INSTALLATION)
Base $30.41Fringe $11.47
Rate
TRUCK DRIVER: DUMP TRUCK
Base $13.50Fringe $1.15
+9 more occupation rates in this WD
Davis-Baconstate match
MS20260041 (Rev 1)
Open WD
Published May 18, 2026Mississippi • Lafayette
Rate
ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING, HVAC/TEMPERATURE CONTROLS INSTALLATION AND WIRING)
Base $28.80Fringe $14.14
Rate
IRONWORKER, STRUCTURAL
Base $30.00Fringe $19.58
Rate
PLUMBER
Base $30.41Fringe $11.47
+10 more occupation rates in this WD
Davis-Baconstate match
MS20260036 (Rev 1)
Open WD
Published May 18, 2026Mississippi • Tate
Rate
ROOFER, INCLUDES SHAKE & SHINGLE ROOFS
Base $12.00Fringe $0.00
Rate
PLUMBER
Base $14.62Fringe $0.00
Rate
PAINTER
Base $11.00Fringe $0.00
+6 more occupation rates in this WD

Description

BID: 352-20260515092248 MDT

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,709,381,432
Sector total $1,709,381,432 • Share 100.0%
Live
Median
$103,788
P10–P90
$28,887$3,400,257
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,709,381,432)
Deal sizing
$103,788 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.