Skip to content
Department of Energy

Request for Proposals: Artificial Intelligence Infrastructure and Energy Generation on DOE Land at the Oak Ridge Reservation

Solicitation: DE-ORR-0037830
Notice ID: 42ef0457d59e41f9b68cab0246079b34
TypeCombined Synopsis SolicitationSource codes53PSCX1PZSet-AsideNONEDepartmentDepartment of EnergyStateTNPostedJan 26, 2026, 12:00 AM UTCDueDec 01, 2025, 09:00 PM UTCExpiredBid range$625,611 - $741,464
Contract snapshot

Combined Synopsis Solicitation from ENERGY, DEPARTMENT OF • ENERGY, DEPARTMENT OF. Place of performance: TN. Response deadline: Dec 01, 2025. Industry: Source industry codes 53 • PSC X1PZ.

Source
Open on SAM.gov →
Solicitation
DE-ORR-0037830
Performance
Oak Ridge, Tennessee • 37830 United States
Response
Dec 01, 2025, 09:00 PM UTC
Open on SAM.gov →
Map for TN
Live POP
Place of performance
Oak Ridge, Tennessee • 37830 United States
State: TN
Contracting office
Oak Ridge, TN • 37831 USA

Point of Contact

Name
Ryan Fuesting
Email
fuestingrj@ornl.gov
Phone
865-341-3697
Name
Matt Reardon
Email
matthew.reardon@emcbc.doe.gov
Phone
513-744-2143

Agency & Office

Department
ENERGY, DEPARTMENT OF
Agency
ENERGY, DEPARTMENT OF
Subagency
SC OAK RIDGE OFFICE
Office
Not available
Contracting Office Address
Oak Ridge, TN
37831 USA

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
TN20260154 (Rev 1)
Published May 18, 2026Tennessee • Claiborne, Clay
12 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 10 more rate previews.
Davis-BaconBest fitstate match
TN20260154 (Rev 1)
Open WD
Published May 18, 2026Tennessee • Claiborne, Clay
Rate
POWER EQUIPMENT OPERATOR: CRANE
Base $36.25Fringe $13.40
Rate
POWER EQUIPMENT OPERATOR: BULLDOZER
Base $33.23Fringe $13.40
Rate
POWER EQUIPMENT OPERATOR (BACKHOE/TRACKHOE/EXCAVATOR)
Base $33.23Fringe $13.40
+9 more occupation rates in this WD
Davis-Baconstate match
TN20260162 (Rev 2)
Open WD
Published May 18, 2026Tennessee • Hardin, Haywood
Rate
ELECTRICIAN
Base $27.25Fringe $15.72
Rate
POWER EQUIPMENT OPERATOR: CRANE
Base $36.25Fringe $13.40
Rate
POWER EQUIPMENT OPERATOR: BULLDOZER
Base $33.23Fringe $13.40
+10 more occupation rates in this WD
Davis-Baconstate match
TN20260142 (Rev 1)
Open WD
Published May 18, 2026Tennessee • Cannon, Cheatham, Davidson +7
Rate
ELECTRICIAN
Base $34.92Fringe $14.75
Rate
OPERATING ENGINEERS: BULLDOZER, CRANE, AND FORKLIFT (CHEATHAM, DAVIDSON, DICKSON, HICKMAN, RUTHERFORD, WILLIAMSON AND WILSON COUNTIES)
Base $33.15Fringe $13.62
Rate
OPERATING ENGINEERS: FORKLIFT (CANNON, MACON, AND SMITH COUNTIES)
Base $30.44Fringe $13.40
+7 more occupation rates in this WD
Davis-Baconstate match
TN20260025 (Rev 1)
Open WD
Published May 18, 2026Tennessee • Cannon, Cheatham, Dickson +7
Rate
ROOFER, INCLUDES SHAKE & SHINGLE ROOFS
Base $10.25Fringe $0.00
Rate
PLUMBER
Base $17.50Fringe $0.00
Rate
OPERATOR: BACKHOE
Base $13.17Fringe $0.00
+6 more occupation rates in this WD

Description

***DOE has temporarily paused all current AI and Energy land use RFI/RFO/RFA/RFPs pending a department review***

The Oak Ridge National Laboratory Site Office (“OSO”) in collaboration with the Oak Ridge Office of Environmental Management (“OREM”), is issuing this Request for Proposals (the “RFP”) to solicit proposals from entities interested in entering into a long-term Lease Agreement(s) covering real property located in Oak Ridge, TN (the “DOE Sites”). The Lease Agreement(s) with the Government that would result from this RFP are for the purposes of designing, financing, permitting, developing, constructing, installing, owning, maintaining, operating, and decommissioning AI data center and/or energy generation infrastructure.

Interested parties need to refer to attached RFP detailed document and supplement documents for specific details.

Please refer all questions regarding this RFP to the Points of Contacts listed on this posting. All questions are due no later than COB November 11, 2025.

Advisory bid range

Pricing and bid posture

high confidence
$625,611 - $741,464

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$625,611
Target
$662,022
Premium
$741,464
Labor
$329,680
Direct
$32,000
Burden
$221,360
Fee + reserve
$78,022
Target $662,022Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,474,911
Sector total $3,515,474,911 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,474,911)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice DE-ORR-0037830
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans
Other matched support routes

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.