Skip to content
Federal Bid Partners LLCProposal & grant writing, plus GSA Schedules
Department of Homeland Security

Station Chetco River Replacement Flooring

Solicitation: Not available
Notice ID: 4aeee72cdc7e77324b34f747c04bb11e
DepartmentDepartment of Homeland SecurityStateORPostedJun 03, 2026, 12:00 AM UTCDueJul 06, 2026, 04:00 AM UTCCloses in 26 daysBid range$714,020 - $846,246
Contract snapshot

Federal opportunity from HOMELAND SECURITY, DEPARTMENT OF. Place of performance: OR. Response deadline: Jul 06, 2026.

Source
Open on official portal →
Solicitation
4aeee72cdc7e77324b34f747c04bb11e
Performance
OR, US
Response
Jul 06, 2026, 04:00 AM UTC
Open on official portal →
Live POP
Place of performance
OR, US
State: US
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
HOMELAND SECURITY, DEPARTMENT OF
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
OR20260085 (Rev 1)
Published May 18, 2026Oregon • Douglas
15 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 13 more rate previews.
Davis-BaconBest fitstate match
OR20260085 (Rev 1)
Open WD
Published May 18, 2026Oregon • Douglas
Rate
HEAT & FROST INSULATOR
Base $62.02Fringe $22.36
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE
Base $54.75Fringe $16.90
+12 more occupation rates in this WD
Davis-Baconstate match
OR20260088 (Rev 1)
Open WD
Published May 18, 2026Oregon • Morrow
Rate
HEAT & FROST INSULATOR
Base $62.02Fringe $22.36
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)
Base $52.12Fringe $24.37
+14 more occupation rates in this WD
Davis-Baconstate match
OR20260007 (Rev 2)
Open WD
Published May 18, 2026Oregon • Klamath
Rate
CARPENTERS: (INCLUDING FORM WORK-SINGLE UNIT)
Base $33.48Fringe $14.03
Rate
CARPENTERS: (INCLUDING FORM WORK-MULTI UNIT)
Base $36.27Fringe $14.03
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
+16 more occupation rates in this WD
Davis-Baconstate match
OR20260083 (Rev 1)
Open WD
Published May 18, 2026Oregon • Crook
Rate
HEAT & FROST INSULATOR
Base $62.02Fringe $22.36
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)
Base $52.12Fringe $24.37
+14 more occupation rates in this WD

Description

DESCRIPTION OF REQUIREMENT: The Contractor shall provide all labor, materials, equipment, and supervision necessary to remove the existing locker room flooring and install approximately 775 square feet of new Roppe Rubber Tile (or equal) and Roppe Vinyl Wall Base (or equal) at USCG Station Chetco River. All work must be completed in accordance with the Statement of Work, comply with industry standards, and be completed within 90 days after the Notice to Proceed (NTP).Project Address:U.S. Coast GuardStation Chetco River16133 Boat Basin RoadBrookings, OR 97415This acquisition is set aside 100% for SMALL BUSINESS.Where Federal Acquisition Regulation clause language is inconsistent with FAR 13.004, Legal Effect of Quotations, that language is h...

Advisory bid range

Pricing and bid posture

high confidence
$714,020 - $846,246

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$714,020
Target
$755,576
Premium
$846,246
Labor
$217,866
Direct
$259,050
Burden
$171,792
Fee + reserve
$89,048
Target $755,576Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,061,791,448
Sector total $2,061,791,448 • Share 100.0%
Live
Median
$205,632
P10–P90
$30,120$4,158,774
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,061,791,448)
Deal sizing
$205,632 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans
Other matched support routes

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.