Contractor's Bid Form - 05.22.26
Federal opportunity from City of Inman. Place of performance: SC.
- Source
- Open on official portal →
- Solicitation
- 4ccd073e27c980981e2ed83580e59361
- Performance
- SC, US
- Response
- No due date posted
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 7 more rate previews.↓
Description
Town of Inman Contractor’s Bid Form Exhibit B 1 The undersigned respondent having carefully examined the RFP, the cost allocation matrix, the draft AIA Agreements, the construction documents, including the draft geotechnical report, and having clarified all questions, hereby agrees to furnish material and labor to fulfill the Contractor’s responsibilities under the general conditions for the above-referenced project and to abide by the cost and billing rate schedules included herein. Respondent further acknowledges that the projected commencement date of construction is Third quarter, 2026, and that this proposal shall be valid until the commencement of construction and throughout the duration of the construction period. This form should be filled out separately, one for the Police Department project and one for the City Hall project. As stated within the RFP, it should be assumed that both projects will be awarded to the same general contractor; any shared savings with any costs should be considered within this form. 1. GENERAL CONDITIONS GMP for General Conditions for the Work: $ (Detailed Schedule of Values Attached) Portion of Preconstruction Services that is Applied to the Initial Design Assist Process: (Included Above-Broken Out for Reference) $_____________________ Daily Rate for General Conditions for Changes in the Work: $ 2. FEE SCHEDULE (Per Cost Allocation Matrix) Sub-Total Contractor’s Fee (Overhead and Profit) $ Sub-Total Contractor’s Fee (General Liability Insurance) $ Total Contractor’s Fee (Including All Above) $ Proposed Fees for Changes Proposed Change Order Fee for Contractor’s Work: $ Proposed Change Order Fee for Subcontractor’s Work: $ 3. SCHEDULE Proposed Construction Duration: (Detailed Schedule Attached) Anticipated Weather Delays (included in construction duration) ______________________ 4.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.