VGLZ 182035 REPAIR BASE PERIMETER ROAD
Federal opportunity from Public Agency. Place of performance: United States.
- Source
- Open on official portal →
- Solicitation
- 09413C4qvqBTFk1XLHNg
- Performance
- United States
- Response
- No due date posted
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
Description
The US Air Force is seeking vendors to repair the base perimeter road at a location in Michigan. The project involves constructing new 2 and 3 lane roads, including full-depth pavement repairs, mill/overlay, crack repairs, and work along the entire Perimeter Road and Jefferson Ave. The contractor must maintain a constant flow of traffic during construction and obtain a Macomb County Soil Erosion Permit. The project also includes the installation of subsurface edge drainage, localized grading,... | Title: VGLZ 182035 REPAIR BASE PERIMETER ROAD, Agency: U.S. Department Of Defense, State: Michigan, Open Date: 2/4/2026, Close Date: 3/25/2027, Last Updated Date: 3/31/2026
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The U.S. Air Force is initiating the VGLZ 182035 project to repair the base perimeter road in Michigan, scheduled for an open date of February 4, 2026. This project includes constructing new 2 and 3 lane roads, as well as performing full-depth pavement repairs and maintaining traffic flow during construction. Vendors must also ensure compliance with local regulations, including obtaining a Macomb County Soil Erosion Permit.
The buyer seeks contractors to repair the base perimeter road, which includes construction, maintenance of traffic, and environmental compliance tasks.
- Construction companies with experience in road repair
- Firms familiar with governmental contracts and requirements
- Vendors with a solid understanding of state and local regulations
- Construct new 2 and 3 lane roads
- Perform full-depth pavement repairs
- Mill/overlay existing surfaces
- Conduct crack repairs on existing roads
- Install subsurface edge drainage
- Localized grading across the site
- Maintain constant flow of traffic during construction
- Obtain Macomb County Soil Erosion Permit
- Profile and capabilities statement
- Past performance examples
- Compliance with local permit requirements
- Detailed project approach
- Cost proposal including labor and materials
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must maintain traffic flow during construction
- Obtain Macomb County Soil Erosion Permit
- Consider the cost of materials and labor in Michigan
- Account for potential delays and traffic management needs
- Explore partnerships with local subcontractors for specialized tasks
- Consider teaming with environmental compliance firms
- Potential for delays due to weather or traffic
- Compliance risks related to local permits
- Budget overruns due to unexpected site conditions
- What are the specific traffic management requirements during construction?
- Can we get detailed specifications for pavement repair methods?
- What are the penalties for not maintaining traffic flow?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific response deadlines provided
- Details on required documentation not specified
- Uncertainty about the total project budget
- Field conditions affecting construction are unspecified
- No information on pre-bid conferences or site visits
- Lack of specifications for materials and techniques required
- Information on project duration is vague beyond the open and close dates
- Absence of any existing infrastructure assessment details
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.