Skip to content
University of Tennessee System

Fletcher Hall Addition & Renovation – (Bid Package 4 – Main Building Package)

Solicitation: Not available
Notice ID: 5221bf4ecce33df21aa80e8cacb787ce
DepartmentUniversity of Tennessee SystemStateTNPostedMar 17, 2026, 12:00 AM UTCDueNo due date postedBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from University of Tennessee System. Place of performance: TN.

Source
Open on official portal →
Solicitation
5221bf4ecce33df21aa80e8cacb787ce
Performance
TN, US
Response
No due date posted
Open on official portal →
Live POP
Place of performance
TN, US
State: US
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
University of Tennessee System
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
TN20260026 (Rev 1)
Published May 18, 2026Tennessee • Carter, Hawkins, Sullivan +2
9 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 7 more rate previews.
Davis-BaconBest fitstate match
TN20260026 (Rev 1)
Open WD
Published May 18, 2026Tennessee • Carter, Hawkins, Sullivan +2
Rate
ROOFER, INCLUDES SHAKE & SHINGLE ROOFS
Base $10.25Fringe $0.00
Rate
PLUMBER
Base $17.50Fringe $0.00
Rate
OPERATOR: BACKHOE
Base $13.17Fringe $0.00
+6 more occupation rates in this WD
Davis-Baconstate match
TN20260012 (Rev 1)
Open WD
Published May 18, 2026Tennessee • Decatur, Dyer, Gibson +2
Rate
ROOFER: SHAKE & SHINGLE ROOF
Base $11.99Fringe $0.00
Rate
PLUMBER
Base $13.08Fringe $0.00
Rate
PAINTER: BRUSH, ROLLER AND SPRAY
Base $9.67Fringe $0.00
+7 more occupation rates in this WD
Davis-Baconstate match
TN20260133 (Rev 1)
Open WD
Published May 18, 2026Tennessee • Polk
Rate
ELECTRICIAN
Base $35.35Fringe $14.63
Rate
OPERATING ENGINEERS: (FORKLIFT)
Base $30.44Fringe $13.40
Rate
OPERATING ENGINEERS: (BULLDOZER AND CRANE)
Base $33.23Fringe $13.40
+6 more occupation rates in this WD
Davis-Baconstate match
TN20260021 (Rev 1)
Open WD
Published May 18, 2026Tennessee • Rutherford
Rate
ROOFER, INCLUDES SHAKE & SHINGLE ROOFS
Base $10.25Fringe $0.00
Rate
PLUMBER
Base $17.50Fringe $0.00
Rate
OPERATOR: BACKHOE
Base $13.17Fringe $0.00
+6 more occupation rates in this WD

Description

No Description Available..

Advisory bid range

Pricing and bid posture

medium confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,513,923,140
Sector total $3,513,923,140 • Share 100.0%
Live
Median
$350,000
P10–P90
$31,970$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,513,923,140)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.