Studios Energy South Chiller Expansion
Federal opportunity from Central Florida Tourism Oversight District. Place of performance: FL. Response deadline: Jun 26, 2026.
- Source
- Open on official portal →
- Solicitation
- 532427656cc9e27baaa46d8dc8ec9e14
- Performance
- Lake Buena Vista, FL
- Response
- Jun 26, 2026, 06:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 5 more rate previews.↓
Description
<p>This project includes the expansion of the Studios Energy South (SES) Chiller Plant, including the installation of new chillers, pumps, cooling tower systems, electrical and fire protection systems, associated piping and controls, site modifications, and related infrastructure improvements.</p><p>The construction site is located at 397 Cypress Drive – Lake Buena Vista, FL 32830.</p><p>SCOPE OVERVIEW:<br>A. Installation of new owner-furnished chiller and all associated piping, appurtenances, and controls;<br>B. Installation of (2) new owner-furnished chilled water pumps and all associated piping, appurtenances, and controls;<br>C. Installation of new concrete cooling tower basin, separate concrete pump pit, and all cooling tower piping, appurtenances, and controls. Cooling tower shall be field-erected by cooling tower manufacturer (TEI). Contractor shall be responsible for coordinating the installation of cooling tower with TEI. A 24" diameter underground equalizer pipe shall connect the new basin with the existing basin; new pipe shall connect to pipe installed in a previous project;<br>D. Installation of (2) new owner-furnished condenser water pumps and all associated piping, appurtenances, and controls;<br>E. All electrical systems supporting the above items #1-4 as well as lighting at new cooling tower and pump area and lightning protection at new cooling tower and pump area;<br>F. New make-up water and overflow drain systems at new cooling tower;<br>G. New fire protection system for new cooling tower. Fire protection system shall be a separate, alarmed branch from the existing dry valve system;<br>H. Removal and relocation of existing yard drain where new cooling tower basin is to be installed;<br>I. Removal of existing sidewalks along the east and south perimeter of the cooling tower yard and relocation of the fenceline;<br>J. Waterproofing of new cooling tower basin</p>
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Service match
Optional support routes matched to this notice after the core solicitation details.
Other matched support routes↓
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.