Skip to content
State of Texas

CONSTRUCTION MANAGER-AT-RISK for TSBVI GENERATORS AND HVAC REPLACEMENTS

Solicitation: Not available
Notice ID: 5759f31966d7313cff2c57213dbbdaa3
DepartmentState of TexasAgencyTX SmartBuy Member 303StateTXPostedMay 04, 2026, 12:00 AM UTCDueMay 27, 2026, 03:00 PM UTCCloses in 0 daysBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from TX SmartBuy Member 303 • State of Texas. Place of performance: TX. Response deadline: May 27, 2026.

Source
Open on official portal →
Solicitation
5759f31966d7313cff2c57213dbbdaa3
Performance
TX
Response
May 27, 2026, 03:00 PM UTC
Open on official portal →
Live POP
Place of performance
TX
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
State of Texas
Agency
TX SmartBuy Member 303
Subagency
TX SmartBuy Member 303
Office
Not available
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
TX20260211 (Rev 1)
Published May 18, 2026Texas • Kenedy, Kinney
23 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 21 more rate previews.
Davis-BaconBest fitstate match
TX20260211 (Rev 1)
Open WD
Published May 18, 2026Texas • Kenedy, Kinney
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.50Fringe $8.89
Rate
BOILERMAKER
Base $33.17Fringe $24.92
Rate
IRONWORKER: REINFORCING AND STRUCTURAL
Base $27.95Fringe $8.03
+20 more occupation rates in this WD
Davis-Baconstate match
TX20260003 (Rev 1)
Open WD
Published May 18, 2026Texas • Cameron, Hidalgo, Webb
Rate
WELDER
Base $14.02Fringe $0.00
Rate
TRUCK DRIVER (TANDEM AXLE TRACTOR WITH SEMI TRAILER)
Base $12.12Fringe $0.00
Rate
TRUCK DRIVER (SINGLE OR TANDEM AXLE DUMP)
Base $14.53Fringe $0.00
+29 more occupation rates in this WD
Davis-Baconstate match
TX20260134 (Rev 1)
Open WD
Published May 18, 2026Texas • Duval
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.50Fringe $8.89
Rate
BOILERMAKER
Base $33.17Fringe $24.92
Rate
IRONWORKER: REINFORCING AND STRUCTURAL
Base $27.95Fringe $8.03
+20 more occupation rates in this WD
Davis-Baconstate match
TX20260147 (Rev 1)
Open WD
Published May 18, 2026Texas • Gray
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $33.23Fringe $7.52
Rate
BOILERMAKER (COLEMAN AND CONCHO COUNTIES)
Base $33.70Fringe $24.41
Rate
CARPENTER
Base $28.57Fringe $9.30
+20 more occupation rates in this WD

Description

1. SCOPE: In accordance with the provisions of Texas Government Code, Chapter 2269, Subchapter F, Construction Manager-at-Risk Method, and Rules and Procedures adopted by the Texas Facilities Commission (TFC), TFC is requesting qualifications for a Construction Manager-at-Risk (CMR) to perform the work required for Texas School for the Blind and Visually Impaired (TSBVI) Generators and HVAC Replacements. The Generators are added for whole or partial back-up of non-Life Safety, but necessary power generation for long-term power outages in four (4) priority buildings, three (3) of which are intended to be used as Shelter-in-Place buildings to accommodate the comfort and safety of live-in students during these periods of time. The fourth (4th) building upgrades the backup equipment already in place for the operations of the campus. This project also replaces thirty-two (32) Roof-top Aaon HVAC units on ten (10) buildings (assorted tonnages), eight (8) split-system HVAC units on Building 610 and three (3) split-system HVAC units on Building 509. Five (5) water heaters in five different buildings are also included. This work will hereinafter be described as TFC Project #25-005-4201 & 2567 (the Project). The TSBVI campus is located at 1100 W 45th St, Austin, TX 78756. This Project will be administered by TFC. This procurement will be a one-step award process with a two-part work requirement. 2. COST OF WORK: Respondents to the RFP should consider the “Cost of Work” as seven million dollars ($7,000,000.00), not including any Pre-construction Management fees, Construction Management fees, and Construction General Conditions 3. CONTRACT TERM: Construction is required to commence within twenty-one (21) calendar days after the Notice to Proceed for Construction is issued. For planning purposes, the pre-construction time period is estimated to be one-hundred twenty (120) calendar days. The construction contract period is projected for a term of three hundred sixty (360) calendar days which should include lead time on equipment manufacture and delivery, but may be otherwise be amended or negotiated by TFC to suit the School calendar and minimize the disruption of the students.
Class/Item Code: 90922-Building Construction, Non; 90924-Building Construction, Commercial And Institutional; 90930-Building Construction (Not Otherwise Classified); 90977-Special Construction: Observatory, Security, Special Rooms, Etc.; 91115-C.I.P., Construction and Rehabilitation, Other than Buildings; 91116-C.I.P., Construction and Rehabilitation, Buildings;
Agency/TX SmartBuy Member #: 303
Contact: Bob Sonnier | robert.sonnier@tfc.texas.gov | (512) 463-1861
Advisory bid range

Pricing and bid posture

high confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,513,923,140
Sector total $3,513,923,140 • Share 100.0%
Live
Median
$350,000
P10–P90
$31,970$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,513,923,140)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.