Shed E Ceiling Fans and Electrical Improvements
Federal opportunity from Strategic Procurement Department (SPD) • Miami-Dade County. Place of performance: FL. Response deadline: Jul 02, 2026.
- Source
- Open on official portal →
- Solicitation
- RPQ No 2024-009R
- Performance
- Miami-Dade County, FL
- Response
- Jul 02, 2026, 06:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 42 more rate previews.↓
Description
The Work consists of furnishing all materials, labor, and equipment necessary to install four (4) ceiling fans within the warehouse area of Shed E at PortMiami. The project also includes the installation of three (3) new electrical receptacles, along with all associated electrical work, at the kennel location. The Work includes, but is not limited to, the following: • Installation of supplemental structural steel spanning between existing precast joists to support four (4) new large ceiling fans. • Removal of the existing photocell located in panel “R,” including conductors, conduits, and accessories, back to the source. • Removal of four (4) existing exterior disconnects, including associated receptacles, conductors, conduits, and accessories, back to the source. • Removal of four (4) existing breakers in panel “R” feeding the exterior disconnects. • Removal of receptacles and breakers providing power to the existing conveyor in panel “P3W,” circuits 8, 10, and 12. • Removal of four (4) existing 208V, 3-phase, 5-wire receptacles; cap wires and install blank covers. • Patching of all holes left after removal of existing equipment. • Three (3) new receptacles shall be installed near the kennel area and circuited to panel “P3W.” • Each receptacle shall be provided with a 20A, 1-pole breaker, individual neutrals, and approximately 100 feet of 3/4-inch EMT with steel set-screw fittings. Existing conduits may be reused where suitable. • Four (4) new 16-foot ceiling fans shall be installed and circuited back to panel “R.” • Each fan shall be provided with a 25A, 3-pole breaker in panel “R.” • Fan circuits shall utilize 3/4-inch EMT with steel set-screw fittings. • A fan controller shall be installed at a location to be determined by the Owner in coordination • with the end user, CBP. • Provide and install a new fire alarm system in full compliance with NFPA 101, NFPA 72, and all current requirements of the Authority Having Jurisdiction (AHJ). All work shall be performed in accordance with the Contract Documents.
Technical Certification: General Building Contractor, Building Contractor
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.