Pleasant Street Public Stairway Construction Phase
Federal opportunity from Pawtucket • Pawtucket. Place of performance: RI. Response deadline: Jun 25, 2026.
- Source
- Open on official portal →
- Solicitation
- 62b1df3abfa03f5e526f37fbdcf22612
- Performance
- Rhode Island
- Response
- Jun 25, 2026, 04:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 16 more rate previews.↓
Description
The project involves construction of upper and lower pedestrian plaza and an interconnecting public pedestrian steel stairway linking Pleasant Street to Taft Street and the City’s Waterfront District. Primary elements of the work include cast-in-place (CIP) concrete walls, piers, stairs as well as metal stairs, landings and railing systems. Other work in this project includes a new electrical service, installation of conduit and wiring, furnishing and installing site improvements and installing new curbing as well as resetting existing curbing, installation of new and restoration of sidewalk and limited areas of asphalt paving.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.