Skip to content
City of Gilroy

Preparation of a new Parks and Recreation Trails Master Plan

Solicitation: Not available
Notice ID: 6ad6f544f5d74f8812679c8b42746687
DepartmentCity of GilroyStateCAPostedMay 26, 2026, 12:00 AM UTCDueJun 18, 2026, 07:00 AM UTCCloses in 23 daysBid range$625,611 - $741,464
Contract snapshot

Federal opportunity from City of Gilroy. Place of performance: CA. Response deadline: Jun 18, 2026.

Source
Open on official portal →
Solicitation
6ad6f544f5d74f8812679c8b42746687
Performance
Gilroy, CA
Response
Jun 18, 2026, 07:00 AM UTC
Open on official portal →
Map for CA
Live POP
Place of performance
Gilroy, CA
State: CA
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
City of Gilroy
Agency
Not available
Subagency
Not available
Office
Purchasing
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
CA20260023 (Rev 1)
Published May 18, 2026California • Amador
129 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 127 more rate previews.
Davis-BaconBest fitstate match
CA20260023 (Rev 1)
Open WD
Published May 18, 2026California • Amador
Rate
TRUCK DRIVERS: GROUP 37 Over 80 to 95 yds
Base $22.34Fringe $7.04
Rate
TRUCK DRIVERS: GROUP 36 Over 65 to 80 yds
Base $19.99Fringe $7.04
Rate
Helicopter pilot (when transporting workers ormaterials); Skid (debris box, over 50 yds. and under 65 yds. water level); Truck (dry pre-batch concrete mix, over 50 yds. and under 65 yds. water level)
Base $19.04Fringe $7.04
+126 more occupation rates in this WD
Davis-Baconstate match
CA20260013 (Rev 1)
Open WD
Published May 18, 2026California • Shasta
Rate
ROOFER
Base $9.11Fringe $0.00
Rate
PLUMBER
Base $10.00Fringe $0.00
Rate
PAINTER
Base $10.45Fringe $0.00
+4 more occupation rates in this WD
Davis-Baconstate match
CA20260029 (Rev 1)
Open WD
Published May 18, 2026California • Alpine, Amador, Calaveras +3
Rate
IRONWORKER (ALPINE, INYO AND MONO COUNTIES)
Base $43.75Fringe $34.45
Rate
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)
Base $43.50Fringe $37.42
Rate
ROOFER
Base $23.00Fringe $0.00
+6 more occupation rates in this WD
Davis-Baconstate match
CA20260021 (Rev 2)
Open WD
Published May 18, 2026California • Tulare
Rate
TERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT)
Base $35.31Fringe $12.75
Rate
ASBESTOS WORKERS/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)
Base $64.56Fringe $25.07
Rate
BOILERMAKER
Base $45.60Fringe $38.99
+112 more occupation rates in this WD

Description

Bid Postings • Preparation of a new Parks and Recreation Tra Skip to Main Content Living & Visiting Business & Development Services City Hall Search Home Bid Postings Print Sign up to receive a text message or email when new bids are added! Print Bid Number: 26-RFP-PW-538 Bid Title: Preparation of a new Parks and Recreation Trails Master Plan Category: Request for Proposals Status: Open Description: Notice is hereby given that electronic requests for proposals will be received at the City of Gilroy, for Preparation of a new Parks and Recreational Trails Master Plan as described in the Request for Proposal No. 26-RFP-PW- 538. Submittals will be accepted by email to until 2 PM, PST, June 18, 2026. Proposals received after that time and date will not be considered. The City of Gilroy accepts no responsibility if delivery is made to another location other than the location specified above and/or delayed deliveries by your chosen carrier. An evaluation team will review submitted proposals and select the best qualified firm based on the evaluation criteria and selection process outlined in the RFP. The selected Contractor will then be recommended to the City Council for an agreement. A free electronic copy of the RFP can be obtained by clicking following the link below. Consultants are responsible for checking the City’s website and acknowledging any addenda prior to submitting a proposal and may be considered non-responsive if their proposal does not reflect those addenda. Any complaints or perceived inequities related to this RFP shall be made in writing and directed to the Purchasing Coordinator at the address listed above and in accordance with the City purchasing policy located at https://www.cityofgilroy.org/792/Financial-Policies . Respectfully Requested, Carina Baksa Purchasing Coordinator Publication Date/Time: 5/14/2026 12:00 AM Closing Date/Time: 6/18/2026 2:00 PM Related Documents: View Document(s) Return To Main Bid Postings Page Live Edit Contact Us Gilroy City Hall 7351 Rosanna Street Gilroy, CA 95020 Get Directions Email the City Quick Links Staff Directory Public Records Permits Construction & Development Staff Directory City of Gilroy Staff Directory Administration Community Development Finance Human Resources Public Works /QuickLinks.aspx Public Records Public Records Portal Public Records Request Center PD Application for Release of Information /QuickLinks.aspx Permits Encroachment & Transportation Permits Fire Prevention Permits Hazardous Waste Inspection & Permit Services Building Permits Re-Roof Permits ADU Permits /QuickLinks.aspx Construction & Development Better Roads Ahead: Gilroy's Pavement Improvement Program City Infrastructure Projects Outside Agency Construction Projects Development Activity Projects /QuickLinks.aspx Contact Us Site Map Accessibility Copyright Notices Privacy Policy /QuickLinks.aspx Loading Loading Do Not Show Again Close Arrow Left Arrow Right [] Slideshow Left Arrow Slideshow Right Arrow

Advisory bid range

Pricing and bid posture

high confidence
$625,611 - $741,464

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$625,611
Target
$662,022
Premium
$741,464
Labor
$329,680
Direct
$32,000
Burden
$221,360
Fee + reserve
$78,022
Target $662,022Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,474,911
Sector total $3,515,474,911 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,474,911)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans
Other matched support routes

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.