42209QR26 NORTH CENTRAL REGION WILDFIRE FIRELINE REHABILITATION PROJECT
Federal opportunity from St. Johns River Water Management Dist. Place of performance: FL. Response deadline: May 13, 2026.
- Source
- Open on official portal →
- Solicitation
- 6c2ff666cb08bacd8b8df336608dc817
- Performance
- Palatka, FL
- Response
- May 13, 2026, 07:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 13 more rate previews.↓
Description
<figure class="table"><table><tbody><tr><td>The St. Johns River Water Management District (the “District”) is seeking submittals from qualified contractors to efficiently restore a total of 82,438 linear feet (15.61 miles) of wildfire suppression lines installed on the Lake George Conservation Area, Heart Island Conservation Area, Clark Bay Conservation Area and the Sunnyhill Restoration Area West Tract to natural grade, so as not to channelize run-off nor disrupt sheet flow. Suppression lines consist of both dozer lines and plow lines. Dozer lines are installed with a dozer blade to improve access for equipment, typically leaving large windrows of debris adjacent to the fireline, averaging 10 to 20 feet in width. Plow lines are individual lines established with a fire plow averaging about 6 feet in width for an individual line (the “Work”). The estimated budget for the Work is $46,000. All Work must be completed by September 30, 2026.</td></tr></tbody></table></figure>
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.