Skip to content
Department of Defense

Bonneville Lock & Dam Elevator & Escalator Monthly Maintenance, Minor Repairs, Emergency Egress, & Inspections

Solicitation: Not available
Notice ID: 728ebad5f5553577921044fcdf63676b
DepartmentDepartment of DefenseStateORPostedMay 01, 2026, 12:00 AM UTCDueMay 28, 2026, 04:00 AM UTCCloses in 1 daysBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from DEPT OF DEFENSE. Place of performance: OR. Response deadline: May 28, 2026.

Source
Open on official portal →
Solicitation
728ebad5f5553577921044fcdf63676b
Performance
OR, US
Response
May 28, 2026, 04:00 AM UTC
Open on official portal →
Live POP
Place of performance
OR, US
State: US
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
DEPT OF DEFENSE
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
OR20260083 (Rev 1)
Published May 18, 2026Oregon • Crook
17 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 15 more rate previews.
Davis-BaconBest fitstate match
OR20260083 (Rev 1)
Open WD
Published May 18, 2026Oregon • Crook
Rate
HEAT & FROST INSULATOR
Base $62.02Fringe $22.36
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)
Base $52.12Fringe $24.37
+14 more occupation rates in this WD
Davis-Baconstate match
OR20260090 (Rev 1)
Open WD
Published May 18, 2026Oregon • Union
Rate
HEAT & FROST INSULATOR
Base $62.02Fringe $22.36
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)
Base $52.12Fringe $24.37
+14 more occupation rates in this WD
Davis-Baconstate match
OR20260069 (Rev 1)
Open WD
Published May 18, 2026Oregon • Jefferson
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
Rate
CARPENTER (EXCLUDING FORM WORK)
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $56.46Fringe $23.05
+29 more occupation rates in this WD
Davis-Baconstate match
OR20260002 (Rev 1)
Open WD
Published May 18, 2026Oregon • Baker
Rate
HEAT & FROST INSULATOR
Base $62.02Fringe $22.36
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)
Base $52.12Fringe $24.37
+14 more occupation rates in this WD

Description

Amendment A00001 - Instructions for Upcoming Pre-Quote Site Visit of Bonneville Lock & DamADDENDUM TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS - COMMERCIAL PRODUCTS AND COMMERCIAL SERVICESRFQ: W9127N26QA066Title: Bonneville Lock & Dam Elevator & Escalator Monthly Maintenance, Minor Repairs, Emergency Egress & InspectionsDate: 12 May 2026, Tuesday Time: (9:00 AM – 12:00 PM PDT)Location: Bonneville Lock & DamDirections: Take I-84 to exit 40, approximately four miles west of Cascade Locks, Oregon. At the flagpole intersection, bear right. Enter the Navigation Lock Visitor Area parking lot just past the guard station as the road veers to the left. U.S. Army Corps of Engineers, Northwestern Division, Portland District, Bonneville Cascade Lock & Dam...

Advisory bid range

Pricing and bid posture

high confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Awarded-market signal for this department (last 12 months).

12-month awarded value
$5,969,174,116,452
Sector total $5,969,174,116,452 • Share 100.0%
Live
Median
$90,048
P10–P90
$30,002$2,493,600
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
-99%(-$5,827,988,001,536)
Deal sizing
$90,048 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans
Other matched support routes

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.