Installation of Sixteen (16) Solar Panels
Federal opportunity from Public Agency. Place of performance: United States.
- Source
- Open on official portal →
- Solicitation
- 0ETV7mftbmbRZBGi8zdC
- Performance
- United States
- Response
- No due date posted
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
Description
Riverside Transit Agency is seeking a qualified contractor to procure, deliver, and install sixteen (16) solar‑panel and LED‑lighting systems at designated bus shelters throughout Riverside County. The work is a one‑time, firm‑fixed‑price contract that includes removal of existing equipment, installation of new photovoltaic panels and lighting fixtures, testing, commissioning, permitting, traffic control, and site cleanup. Bidders must be licensed California electrical or solar contractors, p... | Title: Installation of Sixteen (16) Solar Panels, Agency: Riverside Transit Agency, State: California, Open Date: 3/18/2026, Close Date: 4/8/2026, Last Updated Date: 4/6/2026
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Riverside Transit Agency is soliciting bids for the installation of sixteen (16) solar panels and LED-lighting systems at bus shelters in Riverside County. The contract is firm-fixed-price and requires bidders to be licensed California electrical or solar contractors. Key tasks include removal of existing equipment, installation, testing, permitting, and site cleanup, with a response deadline set for April 8, 2026.
The buyer is looking to enhance the sustainability and energy efficiency of bus shelters by installing solar panels and LED lighting, aimed at reducing environmental impact and operational costs.
- Licensed California electrical contractors
- Licensed California solar contractors
- Contractors with experience in renewable energy installations
- Procurement and delivery of solar panels
- Installation of solar panels and LED systems
- Removal of existing equipment
- Testing and commissioning of new systems
- Permitting and compliance with local regulations
- Traffic control during installation
- Site cleanup after installation
- Proof of California contractor licensing
- Detailed project plan and timeline
- Cost breakdown for all stages of work
- Evidence of past solar panel installations
- Compliance documents for environmental regulations
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must comply with California state regulations for electrical installations
- Permitting requirements specific to Riverside County
- Firm-fixed-price contract structure suggests a need for accurate cost estimations
- Consider including potential contingencies for unforeseen site conditions
- Subcontract with local suppliers of solar technology
- Team with an experienced permitting specialist in Riverside County
- Delays in permitting could impact project timeline
- Site conditions may vary leading to unexpected costs
- Weather conditions during installation may cause delays
- What are the specific locations for the bus shelters?
- Are there existing contracts or agreements in place regarding removal of current installations?
- What is the expected timeline for permitting approval?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No detailed timeline provided beyond dates
- No budget range specified for bid submissions
- No information on potential penalties for delays
- No specifics on existing equipment removal process
- Lack of clarity on preferred panel types or brands
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.