Skip to content
Miami-Dade County

Entire Perimeter Fencing At Homestead Air Reserve Base

Solicitation: RPQ No MDFR-882-HARB-F
Notice ID: 7d669d03d53dd1dcfd601a945b57badf
Contract snapshot

Federal opportunity from Strategic Procurement Department (SPD) • Miami-Dade County. Place of performance: FL. Response deadline: May 14, 2026.

Source
Open on official portal →
Solicitation
RPQ No MDFR-882-HARB-F
Performance
Miami-Dade County, FL
Response
May 14, 2026, 02:00 PM UTC
Open on official portal →
Map for FL
Live POP
Place of performance
Miami-Dade County, FL
State: FL
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Miami-Dade County
Agency
Strategic Procurement Department (SPD)
Subagency
Strategic Procurement Department (SPD)
Office
Strategic Procurement Department (SPD)
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match • county match
FL20260074 (Rev 1)
Published May 18, 2026Florida • Miami-Dade
44 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 42 more rate previews.
Davis-BaconBest fitstate match • county match
FL20260074 (Rev 1)
Open WD
Published May 18, 2026Florida • Miami-Dade
Rate
ELECTRICIAN
Base $40.24Fringe $14.94
Rate
OPERATOR: CRANE (CRANES 76 TON TO 129 TON)
Base $37.57Fringe $14.90
Rate
OPERATOR: CRANE (CRANES 130-300 TON)
Base $39.38Fringe $14.90
+41 more occupation rates in this WD
Davis-Baconstate match • county match
FL20260260 (Rev 1)
Open WD
Published May 18, 2026Florida • Miami-Dade
Rate
TRUCK DRIVER: DISTRIBUTOR TRUCK
Base $19.02Fringe $0.00
Rate
TRUCK DRIVER: WATER TRUCK
Base $18.27Fringe $0.00
Rate
TRUCK DRIVER: OFF THE ROAD TRUCK
Base $16.55Fringe $0.00
+30 more occupation rates in this WD
Davis-Baconstate match
FL20260027 (Rev 1)
Open WD
Published May 18, 2026Florida • Union
Rate
ELECTRICIAN
Base $33.50Fringe $13.85
Rate
OPERATOR: CRANE (TOWER CRANE; LOCOMOTIVE CRANE; CRAWLER CRANE; TRUCK CRANE; & HYDRO CRANE)
Base $35.41Fringe $13.60
Rate
OPERATOR: CRANE (GANTRY CRANE & BRIDGE CRANE)
Base $35.41Fringe $13.60
+12 more occupation rates in this WD
Davis-Baconstate match
FL20260235 (Rev 1)
Open WD
Published May 18, 2026Florida • Washington
Rate
TRUCK DRIVER: PILOT CAR
Base $15.05Fringe $0.00
Rate
TRUCK DRIVER: DISTRIBUTOR TRUCK
Base $19.40Fringe $0.00
Rate
TRUCK DRIVER: WATER TRUCK
Base $17.87Fringe $0.00
+22 more occupation rates in this WD

Description

CONTRACTOR TO PROVIDE THE NECESSARY THE PERMITS, MATERIALS, EQUIPMENT AND LABOR TO ACCOMPLISH THE FOLLOWING: A. Layout of Work: The work generally consists of the installation of approximately 7,900 linear feet of 9-gauge galvanized post driven chain-link fencing, including a top tension wire and a 12-inch, three-strand barbed-wire extension, along with (12) new gates. In addition, approximately 1,750 linear feet of three-strand barbed wire will be added to existing fencing. B. Fence Specifications: 1. Chain Link Fence 6’ high fabric with 12” barbed wire. (total 7’) 2. Fabric: 9 gauge galvanized 2” diamond mesh. Class 2 zinc coating or equivalent corrosion protection. 3. Tension Wire: No. 7 gauge zinc galvanized. 4. Line Posts: 1 7/8” OD Schedule 40. Post driven in limerock. 5. Terminal / Corner / Pull Posts: 2 3/8” OD Schedule 40. Concrete backfill. 6. Post Spacing: Line posts 8’, Pull Post every 150-200’ 7. Brace Bar: 1 5/8” OD galvanized 8. Truss Rod: 3/8” galvanized 9. Barbed Wire: 12.5 gauge, 3 strand zinc coated or equivalent. C. Scope of Work: 1. Refer to sheet A-1.0 and A-2.0 for details on fencing location and technical drawings. 2. Contractor shall provide all necessary equipment for clearing, grubbing, grading and removal of debris for the fence line or any required clear areas adjacent to the fence. 3. Contractor shall demolish and dispose of approximately 1,200 LF of existing fence. Location will be identified at the site. 4. Contractor shall set posts plumb in accordance with (IAW) ASTM-F567 standards. Terminal posts, Corner Posts, Pull Posts, and Gate Posts shall be set in concrete. Line Posts can be post driven my mechanical means. 5. Line Posts shall be installed at intervals not exceeding 8’ on center. Pull Posts shall be installed every 150’- 200’ with appropriate Brace bar and Truss Rod installed. 6. Contractor shall install the tension wire 4 in. down from the top of the fabric. Tension wire to be stretched taut, independently and prior to the fabric, between the terminal or pull posts and secured using a brace band. Tension wire shall be secured to chain link fabric and line posts with appropriate tie wire. 7. Tension wire can be installed through the barbed wire arm for extra support if necessary. 8. Contractor shall install the Chain Link Fabric and required hardware IAW with ASTM-F567 standards. 9. Barbed wire shall be stretched tout between tension / pull posts. Barbed wire brackets arms shall face outward (away from property) at a 45deg angle. 10. Contractor shall provide and install (7) new galvanized steel frame chain-link swing gates IAW with ASTM-F567 to include heavy terminal posts and concrete footings, hinges, drop rods, and wheels. Gates shall be plumb in the closed position. 12” of barbed wire shall be securely mounted vertically to the top of the swing gates. Refer to sheets A-1.0, A-2.0 for location and specifications. 11. Direction of all swing gates shall be inward and not to interfere with vehicle circulation. Contractor shall notify MDFR project manager in the event a swing gate poses an interference to traffic or vehicle circulation. 12. Contractor shall provide and install (1) new manually operated galvanized steel frame chain-link cantilever gate with 12” barbed wire. Refer to sheet A-1.0, A-2.0 for location and specifications. 13. Contractor shall provide and install a commercial strong arm double gate latch with a cut-resistant locking mechanism. 14. Contractor shall provide and install (3) motorized and (1) manual vehicle rolling gates. Refer to sheet A-1.0, A-2.0 for location and specifications. 15. Motorized rolling gates shall be solar powered with imbedded electrical conduits for future power and data supply. 16. Final pedestal and solar panel location will be coordinated between the Contractor and MDFR Project Manager at each gate location. 17. Contractor shall add additional barbed wire and mounting brackets to +-1,750 liner feet of existing chain link fencing. Refer to sheet A-1.0, A-2.0 for location and specifications. D. Project / Site Conditions 1. Contractor shall be responsible for identifying all underground utilities, communications, and irrigation before work can commence. 2. Work to be performed will be during normal business days / hours, 7:00 AM to 5:00 PM Monday through Friday. Exceptions to this schedule can only be made with the prior written approval of MDFR Project Manager or Designee. 3. Extreme care shall be taken to safeguard all existing facilities, site amenities, windows, and vehicles on or around the job site. Damage to public and/or private properly shall be the responsibility of the Contractor and shall be repaired and/or replaced at no additional cost to MDFR. 4. Contractor shall be responsible for providing all necessary equipment to complete the job. This includes but is not limited to, ladders, tarps, man lifts, extension cords, etc. 5. Contractor shall provide temporary restroom facilities for the workers during the duration of the project. The temporary restroom shall be serviced on a regular basis. 6. Any materials and/or equipment left on site, shall be done with the Contractor, fully and totally responsibility for security. Any loss of materials or equipment due to theft, vandalism, etc., shall be the total responsibility of the Contractor. Such losses shall be replaced or repaired by the Proposer with no additional charges to MDFR. 7. It shall be the responsibility of the Contractor to remove from the job site and properly dispose of all residues at the end of each and every workday. Materials and equipment left on site overnight, shall be well marked and identified as to ensure safety. Prior approval must be obtained from applicable MDFR personnel before materials or equipment can be left on site over a weekend. 8. Upon completion, the Contractor shall be responsible for leaving the job site free of all debris and in an orderly state. Clean all floors, walls, doors, windows walks, paving, and site features of dirt and other debris. 9. Any delays on the construction timeline needs to be immediately communicated to the MDFR project manager with a corrective action plan.
Technical Certification: Fence

Advisory bid range

Pricing and bid posture

high confidence
$625,611 - $741,464

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$625,611
Target
$662,022
Premium
$741,464
Labor
$329,680
Direct
$32,000
Burden
$221,360
Fee + reserve
$78,022
Target $662,022Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice RPQ NO MDFR-882-HARB-F
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.