HVAC System Evaluation & Schematic Design Services
Federal opportunity from State of CT - DAS Procurement • Brookfield, Town of. Place of performance: CT. Response deadline: May 20, 2026.
- Source
- Open on official portal →
- Solicitation
- 8f28a94deee63f62954194cbd4265b44
- Performance
- Hartford, CT
- Response
- May 20, 2026, 12:56 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 17 more rate previews.↓
Description
The Town of Brookfield, on behalf of Brookfield Public Schools (“the District”), invites qualified engineering firms to submit proposals for HVAC System Evaluation and System Replacement options for: • Brookfield High School (BHS) - 45 Long Meadow Hill Road, Brookfield, CT • Whisconier Middle School (WMS) - 15 West Whisconier Road, Brookfield, CT Note: This RFP is revised from RFP B-26-01, posted December 2025, and is limited to the initial phase only (evaluation and replacement options). Future phases (Design Development, Construction Documents, Contractor Selection and Construction Administration) may be procured separately or as an amendment.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.