Skip to content
State of Utah

EMC WWTF Wastewater Expansion Oxidation Ditch Upgrades GMP 2

Solicitation: EMC-DY26-15
Notice ID: 93c0f7009fff5ef8c0e91836df635110
DepartmentState of UtahStateUTPostedMay 07, 2026, 12:00 AM UTCDueMay 26, 2026, 04:00 AM UTCCloses in 0 daysBid range$625,611 - $741,464
Contract snapshot

Federal opportunity from State of Utah. Place of performance: UT. Response deadline: May 26, 2026.

Source
Open on official portal →
Solicitation
EMC-DY26-15
Performance
UT, US
Response
May 26, 2026, 04:00 AM UTC
Open on official portal →
Live POP
Place of performance
UT, US
State: US
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
State of Utah
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
UT20260036 (Rev 1)
Published May 18, 2026Utah • Tooele
53 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 51 more rate previews.
Davis-BaconBest fitstate match
UT20260036 (Rev 1)
Open WD
Published May 18, 2026Utah • Tooele
Rate
OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION)
Base $21.50Fringe $15.65
Rate
OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.)
Base $23.37Fringe $15.65
Rate
OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR
Base $24.37Fringe $15.65
+50 more occupation rates in this WD
Davis-Baconstate match
UT20260096 (Rev 1)
Open WD
Published May 18, 2026Utah • Box Elder, Morgan
Rate
ELECTRICIAN
Base $41.23Fringe $17.66
Rate
POWER EQUIPMENT OPERATOR (MECHANIC)
Base $33.04Fringe $16.09
Rate
TRAFFIC CONTROL (FLAGGER)
Base $23.71Fringe $9.78
+7 more occupation rates in this WD
Davis-Baconstate match
UT20260020 (Rev 1)
Open WD
Published May 18, 2026Utah • Millard
Rate
OPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR
Base $30.78Fringe $16.09
Rate
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY
Base $22.03Fringe $11.88
Rate
OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY
Base $35.68Fringe $17.57
+18 more occupation rates in this WD
Davis-Baconstate match
UT20260097 (Rev 1)
Open WD
Published May 18, 2026Utah • Salt Lake, Tooele
Rate
LINE CONSTRUCTION: LINEMAN
Base $58.83Fringe $21.21
Rate
ELECTRICIAN
Base $41.23Fringe $17.66
Rate
POWER EQUIPMENT OPERATOR (MECHANIC)
Base $33.04Fringe $16.09
+10 more occupation rates in this WD

Description

MGC, Inc. (MGC) has been selected as the Construction Manager / General Contractor (CM/GC) for the 2025 6.0 MGD MBR Wastewater Expansion project. This GMP2 is an early work package of the EMWWTF 6.0 MGD MBR Wastewater Expansion project, the Eagle Mountain WWTF Oxidation Ditch Upgrades (the Project) located in Eagle Mountain City, Utah 84005. Eagle Mountain City is seeking proposals from qualified subcontractors and suppliers from each trade to complete each component of the project except for the Systems Integrator that will be SKM and negotiated separately. The construction of the EMWWTF Oxidation Ditch Upgrades project will improve the existing oxidation ditch rated capacity to 2.0 MGD average daily flow. MGC is providing preconstruction ...

Advisory bid range

Pricing and bid posture

high confidence
$625,611 - $741,464

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$625,611
Target
$662,022
Premium
$741,464
Labor
$329,680
Direct
$32,000
Burden
$221,360
Fee + reserve
$78,022
Target $662,022Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,474,911
Sector total $3,515,474,911 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,474,911)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice EMC-DY26-15
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.