Skip to content
Federal Bid Partners LLCProposal & grant writing, plus GSA Schedules
Department of Transportation

FY27 NW Princeton Mansard Roof Project

Solicitation: MODOT 0000000319SL
Notice ID: a1ead8a0fdef65f0cb1ba2e90e36d68e
DepartmentDepartment of TransportationStateMOPostedMay 26, 2026, 12:00 AM UTCDueJun 18, 2026, 07:00 PM UTCCloses in 9 daysBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from Missouri Department of Transportation. Place of performance: MO. Response deadline: Jun 18, 2026.

Source
Open on official portal →
Solicitation
MODOT 0000000319SL
Performance
MO
Response
Jun 18, 2026, 07:00 PM UTC
Open on official portal →
Live POP
Place of performance
MO
Contracting office
Not listed

Point of Contact

Name
LOGAN WILBERS
Email
Logan.Wilbers@modot.mo.gov
Phone
Not available

Agency & Office

Department
Missouri Department of Transportation
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MO20260008 (Rev 1)
Published May 18, 2026Missouri • Cedar
27 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 25 more rate previews.
Davis-BaconBest fitstate match
MO20260008 (Rev 1)
Open WD
Published May 18, 2026Missouri • Cedar
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $31.97Fringe $14.00
Rate
TILE SETTER
Base $26.47Fringe $14.89
Rate
CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION
Base $29.50Fringe $21.50
+24 more occupation rates in this WD
Davis-Baconstate match
MO20260075 (Rev 1)
Open WD
Published May 18, 2026Missouri • Greene
Rate
BRICKLAYER
Base $41.15Fringe $23.90
Rate
TILE SETTER
Base $34.09Fringe $20.36
Rate
CARPENTER
Base $29.50Fringe $21.50
+21 more occupation rates in this WD
Davis-Baconstate match
MO20260086 (Rev 1)
Open WD
Published May 18, 2026Missouri • Christian, Dallas, Polk +1
Rate
BRICKLAYER
Base $41.15Fringe $23.90
Rate
TILE SETTER
Base $34.09Fringe $20.36
Rate
CARPENTER
Base $29.50Fringe $21.50
+20 more occupation rates in this WD
Davis-Baconstate match
MO20260074 (Rev 1)
Open WD
Published May 18, 2026Missouri • Franklin
Rate
HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS)
Base $43.48Fringe $27.24
Rate
BRICKLAYER
Base $41.15Fringe $23.90
Rate
TILE SETTER
Base $34.09Fringe $20.36
+24 more occupation rates in this WD

Description

MoDOT seeks qualified bidder to remove shingled mansard roofing to sheathing and discard debris off-site in a proper manner. Contractor to install High Temperature Ice & Water Barrier over all the mansard sheathing and 26-gauge metal prefinished roof panels on mansard. Contractor to install flashing for a weather tight and complete roofing system. MoDOT will receive bids electronically through MissouriBUYS, via mail, UPS, or FEDEX. It is required you contact the buyer of record via email logan.wilbers@modot.mo.gov five (5) business days before bid closing if you intend to submit a hard copy bid. Site Visit attendance is required for bids to be accepted.

Advisory bid range

Pricing and bid posture

high confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,062,605,586
Sector total $2,062,605,586 • Share 100.0%
Live
Median
$225,000
P10–P90
$30,120$4,158,774
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,062,605,586)
Deal sizing
$225,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice MODOT 0000000319SL
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.