GSU Transformer Supply, Oahe Dam, SD & Ft Peck Dam, MT

Solicitation: W9128F25RA053
Notice ID: bf258e856bcc489f94af379fde8194f7
Contract snapshot

Award Notice from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: SD. Industry: NAICS 335311 • PSC 6120.

Source
Open on SAM.gov →
Solicitation
W9128F25RA053
Performance
Fort Pierre, South Dakota • 57532 United States
Response
No due date posted
Open on SAM.gov →
Map for SD
Live POP
Place of performance
Fort Pierre, South Dakota • 57532 United States
State: SD
Contracting office
Omaha, NE • 68102-4901 USA

Point of Contact

Name
Brandie Murphy
Email
Brandie.L.Stallsworth@usace.army.mil
Phone
Not available
Name
Marc Proietto
Email
marc.proietto@usace.army.mil
Phone
Not available

Agency & Office

Department
DEPT OF DEFENSE
Agency
DEPT OF THE ARMY
Subagency
US ARMY CORPS OF ENGINEERS
Office
ENGINEER DIVISION NORTHWESTERN • ENDIST OMAHA • W071 ENDIST OMAHA
Contracting Office Address
Omaha, NE
68102-4901 USA

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
SD20260028 (Rev 2)
Published May 18, 2026South Dakota • Minnehaha
17 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 15 more rate previews.
Davis-BaconBest fitstate match
SD20260028 (Rev 2)
Open WD
Published May 18, 2026South Dakota • Minnehaha
Rate
BRICKLAYER
Base $41.90Fringe $4.94
Rate
CARPENTER (DRYWALL FINISHING/TAPING, DRYWALL HANGING AND METAL STUD INSTALLATION ONLY)
Base $36.34Fringe $17.15
Rate
ELECTRICIAN
Base $36.32Fringe $16.83
+14 more occupation rates in this WD
Davis-Baconstate match
SD20260001 (Rev 1)
Open WD
Published May 18, 2026South Dakota • Aurora, Beadle, Bennett +63
Rate
Fringes TRUCK DRIVER: Group 2 Group 1: Tandem Truck without trailer or pup; Single Axle Truck over 26,000 GVW with or without Trailer Group 2: Semi-Tractor and Trailer; Tandem Truck with Pup or Trailer
Base $32.07Fringe $8.42
Rate
TRUCK DRIVER: Group 1 Group 1: Tandem Truck without trailer or pup; Single Axle Truck over 26,000 GVW with or without Trailer Group 2: Semi-Tractor and Trailer; Tandem Truck with Pup or Trailer
Base $30.01Fringe $0.00
Rate
for traffic marking purposes. Group 2: Painting or protective coating bridges, apply varnish, antirust materials, prepare steel or other surfaces with primer or sandblasting, paints structural framewor
Base $29.81Fringe $0.00
+8 more occupation rates in this WD
Davis-Baconstate match
SD20260015 (Rev 1)
Open WD
Published May 18, 2026South Dakota • Hughes
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)
Base $55.34Fringe $34.03
Rate
BRICKLAYER
Base $33.58Fringe $4.60
Rate
FOR EMPLOYEES WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY
Base $56.30Fringe $38.44
+14 more occupation rates in this WD
Davis-Baconstate match
SD20260030 (Rev 2)
Open WD
Published May 18, 2026South Dakota • Union
Rate
BRICKLAYER
Base $41.90Fringe $4.94
Rate
CARPENTER (DRYWALL FINISHING/TAPING, DRYWALL HANGING AND METAL STUD INSTALLATION ONLY)
Base $36.34Fringe $17.15
Rate
ELECTRICIAN
Base $36.32Fringe $16.83
+14 more occupation rates in this WD

More in NAICS 335311

Description

Project Description: Ft Peck Supply of the generator step-up (GSU) transformers 4 and 5 located in switchyard #2 at the Fort Peck Dam. The final suppy contract for the Fort Peck transformers will include:
* Design and manufacturing of two new GSU transformers.
* Design and manufacturing of ancillary and control components.
* Performance of Factory Acceptance Testing (FAT).
* Delivery to the Fort Peck power plant, offloading at the transformer temporary storage and staging location, transformer reassembly, oil processing and filling, and movement to final operating location as the location is made available by the separate installation contractor.
* Final acceptance testing and commissioning of transformer after interconnection to the power plant is performed by the separate installation contractor.

Oahe Supply of all GSU transformers locatd at Oahe Dam. The supply contract for the Oahe transformers will include:
* Design and manufacturing of 10 new GSU transformers.
* Design and manufacturing of ancillary and control components.
* Performance of Factory Acceptance Testing (FAT).
* Delivery to the Oahe Dam power plant, offloading at the transformer temporary storage and staging location, transformer reassembly, oil processing and filling, and movement to final operating location as the location is made available by the separate installation contractor.
*Final acceptance testing and commissioning of transformer after interconnection to the power plant is performed by the separate installation contractor.

Award Info

Awardee
PAF ELECTRICAL, INC.
Amount
$56,977,894
Award #
W9128F26CA013
Award Date
2026-02-20
Advisory bid range

Pricing and bid posture

high confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Awarded-market signal for NAICS 335311 (last 12 months), benchmarked to sector 33.

12-month awarded value
$82,516,179
Sector total $53,340,602,409 • Share 0.2%
Live
Median
$350,000
P10–P90
$41,614$350,000
Volatility
Volatile88%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
0.2%
share
Momentum (last 3 vs prior 3 buckets)
+756%($65,248,859)
Deal size index
162.79× median
Award vs latest median (a sizing reference).
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice W9128F25RA053
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans
Other matched support routes

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.