Skip to content
Department of Education

Department of Education Small Business Innovation Research (SBIR) Phase IB 2026: Pre-Solicitation

Solicitation: 91990026R0004
Notice ID: c1d3bae837664e0bb8bcdac754d37e97
Contract snapshot

Presolicitation from EDUCATION, DEPARTMENT OF • EDUCATION, DEPARTMENT OF. Place of performance: DC. Industry: NAICS 541720 • PSC AF11.

Source
Open on SAM.gov →
Solicitation
91990026R0004
Performance
DC
Response
No due date posted
Open on SAM.gov →
Map for DC
Live POP
Place of performance
Not listed
State: DC
Contracting office
Washington, DC • 20202 USA

Point of Contact

Name
David Yadeta
Email
david.yadeta@ed.gov
Phone
Not available
Name
David Geary
Email
david.geary@ed.gov
Phone
Not available

Agency & Office

Department
EDUCATION, DEPARTMENT OF
Agency
EDUCATION, DEPARTMENT OF
Subagency
CONTRACTS AND ACQUISTIONS MANAGEMEN
Office
Not available
Contracting Office Address
Washington, DC
20202 USA

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
DC20260003 (Rev 1)
Published May 18, 2026District of Columbia • Washington, D.C.
15 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 13 more rate previews.
Davis-BaconBest fitstate match
DC20260003 (Rev 1)
Open WD
Published May 18, 2026District of Columbia • Washington, D.C.
Rate
EMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY
Base $24.46Fringe $10.19
Rate
OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT
Base $57.16Fringe $38.44
Rate
es PLUMBER A. PAID HOLIDAYS: LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING, CHRISTMAS DAY, NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY AND THE FOURTH OF JULY
Base $29.60Fringe $14.71
+12 more occupation rates in this WD
Davis-Baconstate match
DC20260002 (Rev 3)
Open WD
Published May 18, 2026District of Columbia • Washington, D.C.
Rate
EMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY
Base $40.77Fringe $20.17
Rate
EMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY
Base $24.46Fringe $10.19
Rate
EMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY
Base $30.21Fringe $10.43
+29 more occupation rates in this WD
Davis-Baconstate match
DC20260001 (Rev 4)
Open WD
Published May 18, 2026District of Columbia • Washington, D.C.
Rate
ASBESTOS WORKER/HEAT AND FROST INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.)
Base $40.77Fringe $20.17
Rate
EMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY
Base $24.46Fringe $10.19
Rate
EMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY
Base $30.21Fringe $10.43
+72 more occupation rates in this WD
Service Contract Actstate match
2015-4281 (Rev 36)
Open WD
Published May 13, 2026District of Columbia, Maryland, Virginia • Charles, District of Columbia, Fairfax +5
01000
Administrative Support And Clerical Occupations 01011 - Accounting Clerk I
Base $21.83Fringe $0.00
01012
Accounting Clerk II
Base $24.50Fringe $0.00
01013
Accounting Clerk III
Base $27.41Fringe $0.00
+356 more occupation rates in this WD

HEALTH & WELFARE: $5.55 per hour, up to 40 hours per week, or $222.00 per week or $962.00 per month HEALTH & WELFARE EO 13706: $5.09 per hour, up to 40 hours per week, or $203.60 per week, or $882.27 per month* *This rate is to be used only when compensating employees for performance on an SCA- covered contract also covered by EO 13706, Establishing Paid Sick Leave for Federal Contractors. A contractor may not receive credit toward its SCA obligations for any paid sick leave provided pursuant to EO 13706. | VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor, 3 weeks after 5 years, and 4 weeks after 15 years. Length of service includes the whole span of continuous service with the present contractor or successor, wherever employed, and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173) | HOLIDAYS: A minimum of eleven paid holidays per year: New Year's Day, Martin Luther King Jr.'s Birthday, Washington's Birthday, Memorial Day, Juneteenth National Independence Day, Independence Day, Labor Day, Columbus Day, Veterans' Day, Thanksgiving Day, and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) (See 29 CFR 4.174) THE OCCUPATIONS WHICH HAVE NUMBERED FOOTNOTES IN PARENTHESES RECEIVE THE FOLLOWING: 1) COMPUTER EMPLOYEES: This wage determination does not apply to any individual employed in a bona fide executive, administrative, or professional capacity, as defined in 29 C.F.R. Part 541. (See 41 C.F.R. 6701(3)). Because most Computer Systems Analysts and Computer Programmers who are paid at least $27.63 per hour (or at least $684 per week if paid on a salary or fee basis) likely qualify as exempt computer professionals under 29 U.S.C. 213(a)(1) and 29 U.S.C. 213(a)(17), this wage determination may not include wage rates for all occupations within those job families. In such instances, a conformance will be necessary if there are nonexempt employees in these job families working on the contract. Job titles vary widely and change quickly in the computer industry, and are not determinative of whether an employee is an exempt computer professional. To be exempt, computer employees who satisfy the compensation requirements must also have a primary duty that consists of: (1) The application of systems analysis techniques and procedures, including consulting with users, to determine hardware, software or system functional specifications; (2) The design, development, documentation, analysis, creation, testing or modification of computer systems or programs, including prototypes, based on and related to user or system design specifications; (3) The design, documentation, testing, creation or modification of computer programs related to machine operating systems; or (4) A combination of the aforementioned duties, the performance of which requires the same level of skills. (29 C.F.R. 541.400). Any computer employee who meets the applicable compensation requirements and the above duties test qualifies as an exempt computer professional under both section 13(a)(1) and section 13(a)(17) of the Fair Labor Standards Act. (Field Assistance Bulletin No. 2006-3 (Dec. 14, 2006)). Accordingly, this wage determination will not apply to any exempt computer employee regardless of which of these two exemptions is utilized. 2) AIR TRAFFIC CONTROLLERS AND WEATHER OBSERVERS - NIGHT PAY & SUNDAY PAY: If you work at night as part of a regular tour of duty, you will earn a night differential and receive an additional 10% of basic pay for any hours worked between 6pm and 6am. If you are a full-time employed (40 hours a week) and Sunday is part of your regularly scheduled workweek, you are paid at your rate of basic pay plus a Sunday premium of 25% of your basic rate for each hour of Sunday work which is not overtime (i.e. occasional work on Sunday outside the normal tour of duty is considered overtime work). ** HAZARDOUS PAY DIFFERENTIAL ** An 8 percent differential is applicable to employees employed in a position that represents a high degree of hazard when working with or in close proximity to ordnance, explosives, and incendiary materials. This includes work such as screening, blending, dying, mixing, and pressing of sensitive ordnance, explosives, and pyrotechnic compositions such as lead azide, black powder and photoflash powder. All dry-house activities involving propellants or explosives. Demilitarization, modification, renovation, demolition, and maintenance operations on sensitive ordnance, explosives and incendiary materials. All operations involving re-grading and cleaning of artillery ranges. A 4 percent differential is applicable to employees employed in a position that represents a low degree of hazard when working with, or in close proximity to ordnance, (or employees possibly adjacent to) explosives and incendiary materials which involves potential injury such as laceration of hands, face, or arms of the employee engaged in the operation, irritation of the skin, minor burns and the like; minimal damage to immediate or adjacent work area or equipment being used. All operations involving, unloading, storage, and hauling of ordnance, explosive, and incendiary ordnance material other than small arms ammunition. These differentials are only applicable to work that has been specifically designated by the agency for ordnance, explosives, and incendiary material differential pay. ** UNIFORM ALLOWANCE ** If employees are required to wear uniforms in the performance of this contract (either by the terms of the Government contract, by the employer, by the state or local law, etc.), the cost of furnishing such uniforms and maintaining (by laundering or dry cleaning) such uniforms is an expense that may not be borne by an employee where such cost reduces the hourly rate below that required by the wage determination. The Department of Labor will accept payment in accordance with the following standards as compliance: The contractor or subcontractor is required to furnish all employees with an adequate number of uniforms without cost or to reimburse employees for the actual cost of the uniforms. In addition, where uniform cleaning and maintenance is made the responsibility of the employee, all contractors and subcontractors subject to this wage determination shall (in the absence of a bona fide collective bargaining agreement providing for a different amount, or the furnishing of contrary affirmative proof as to the actual cost), reimburse all employees for such cleaning and maintenance at a rate of $3.35 per week (or $.67 cents per day). However, in those instances where the uniforms furnished are made of """"wash and wear"""" materials, may be routinely washed and dried with other personal garments, and do not require any special treatment such as dry cleaning, daily washing, or commercial laundering in order to meet the cleanliness or appearance standards set by the terms of the Government contract, by the contractor, by law, or by the nature of the work, there is no requirement that employees be reimbursed for uniform maintenance costs. ** SERVICE CONTRACT ACT DIRECTORY OF OCCUPATIONS ** The duties of employees under job titles listed are those described in the """"Service Contract Act Directory of Occupations"""", Fifth Edition (Revision 1), dated September 2015, unless otherwise indicated. ** REQUEST FOR AUTHORIZATION OF ADDITIONAL CLASSIFICATION AND WAGE RATE, Standard Form 1444 (SF-1444) ** Conformance Process: The contracting officer shall require that any class of service employee which is not listed herein and which is to be employed under the contract (i.e., the work to be performed is not performed by any classification listed in the wage determination), be classified by the contractor so as to provide a reasonable relationship (i.e., appropriate level of skill comparison) between such unlisted classifications and the classifications listed in the wage determination (See 29 CFR 4.6(b)(2)(i)). Such conforming procedures shall be initiated by the contractor prior to the performance of contract work by such unlisted class(es) of employees (See 29 CFR 4.6(b)(2)(ii)). The Wage and Hour Division shall make a final determination of conformed classification, wage rate, and/or fringe benefits which shall be paid to all employees performing in the classification from the first day of work on which contract work is performed by them in the classification. Failure to pay such unlisted employees the compensation agreed upon by the interested parties and/or fully determined by the Wage and Hour Division retroactive to the date such class of employees commenced contract work shall be a violation of the Act and this contract. (See 29 CFR 4.6(b)(2)(v)). When multiple wage determinations are included in a contract, a separate SF-1444 should be prepared for each wage determination to which a class(es) is to be conformed. The process for preparing a conformance request is as follows: 1) When preparing the bid, the contractor identifies the need for a conformed occupation(s) and computes a proposed rate(s). 2) After contract award, the contractor prepares a written report listing in order the proposed classification title(s), a Federal grade equivalency (FGE) for each proposed classification(s), job description(s), and rationale for proposed wage rate(s), including information regarding the agreement or disagreement of the authorized representative of the employees involved, or where there is no authorized representative, the employees themselves. This report should be submitted to the contracting officer no later than 30 days after such unlisted class(es) of employees performs any contract work. 3) The contracting officer reviews the proposed action and promptly submits a report of the action, together with the agency's recommendations and pertinent information including the position of the contractor and the employees, to the U.S. Department of Labor, Wage and Hour Division, for review (See 29 CFR 4.6(b)(2)(ii)). 4) Within 30 days of receipt, the Wage and Hour Division approves, modifies, or disapproves the action via transmittal to the agency contracting officer, or notifies the contracting officer that additional time will be required to process the request. 5) The contracting officer transmits the Wage and Hour Division's decision to the contractor. 6) Each affected employee shall be furnished by the contractor with a written copy of such determination or it shall be posted as a part of the wage determination (See 29 CFR 4.6(b)(2)(iii)). Information required by the Regulations must be submitted on SF-1444 or bond paper. When preparing a conformance request, the """"Service Contract Act Directory of Occupations"""" should be used to compare job definitions to ensure that duties requested are not performed by a classification already listed in the wage determination. Remember, it is not the job title, but the required tasks that determine whether a class is included in an established wage determination. Conformances may not be used to artificially split, combine, or subdivide classifications listed in the wage determination (See 29 CFR 4.152(c)(1)).

More in NAICS 541720

Description

The Institute of Education Sciences (IES) and the U.S. Department of Education (ED) anticipate the release of a 2026 Small Business Innovation Research Program (SBIR) Phase IB solicitation #91990026R0004, on or about April 30, 2026. The proposal submission date will be in late June 2026, approximately 60 days after the solicitation release. 

The program, known as ED/IES SBIR, provides awards to eligible for-profit businesses and partners for the research and development and evaluation of new, commercially viable education technology products (“products”).  

The Phase IB program solicitation will invite eligible for-profit small business firms and partners to submit proposals for $250,000 for contracts to develop and evaluate a prototype of a new component to be integrated with an existing education technology prototype or product over a period of 9 months. The goal of the Phase IB track is to solicit proposals for ground-breaking high-risk high reward approaches to solve pressing problems in education. 

Small Business firms and partners who possess strong research and development and evaluation capabilities for education technology products in the below priority area are encouraged to participate. 

PRIORITY AREA IB: A New Component to be Integrated with an Existing Education Technology Prototype of Product for Use by Learners, Educators or Administrators (or Other School Personnel) 

Successful Phase IB awardees under the solicitation will be eligible to apply for a Phase II award for $1,000,000 in 2027, to fully develop and evaluate the new component to be integrated with the education technology prototype or product over a period of 2 years and to prepare for commercialization. The result from Phase IB and the subsequent Phase II funding under this solicitation will be a novel education technology product. 

Three other 2026 ED/IES SBIR solicitations will be released on the same day as the Phase IB solicitation: 

  • The Phase IA program solicitation 91990026R0003 will request proposals for the development and evaluation of a prototype of an entirely novel education technology product (where no or limited previous development has occurred) over a period of 9 months. The goal of the Phase IA track is to solicit proposals for ground-breaking high-risk high reward approaches to solve pressing problems in education. 

  • The Direct to Phase II program solicitation #91990026R0005 will request proposals for the development of new education technology products to ready existing evidence-based innovations (e.g., products, interventions, tools) for commercial use at scale. Awards will be for $1,000,000 over a period of 2 years.   The existing evidence-based innovation is required to have originally been conceptualized and developed by an academic researcher while at an academic institution or by a researcher at a non-profit education research organization. One or more of the academic researchers that originally created the innovation are required to participate in the project team. Projects that focus on advancing innovations that are not evidence-based will not be eligible for the Direct to Phase II program. 

Important Notes: 

Offerors will not be permitted to submit the same or similar proposals under the 2026 Phase IA, IB, Direct to Phase II or Phase II solicitations. Any duplicate or similar proposals that are submitted under more than one of these 2026 solicitations will be rejected without review. 

For more information and specifications, please refer to the Phase IA, Phase IB, Direct to Phase II or Phase II solicitations after release. 

About the ED/IES SBIR Program 

The purpose of the SBIR program is to stimulate technological innovation in the private sector, strengthen the role of small business in meeting Department research and development needs, increase the commercial potential of Department-supported research results, and improve the return on investment from Federally funded research for economic and social benefits to the Nation. ED/IES SBIR provides awards to eligible for-profit businesses and partners for the research and development and evaluation of new, commercially viable education technology products (“products”). The ED/IES SBIR portfolio consists of research-based and commercially viable products that are widely deployed to address pressing needs in education.  ED/IES SBIR is a highly competitive program – historically about 5 to 7% of submitted proposals resulted in a Phase I award, about 10% result in a Direct to Phase II award, and about 50% of Phase I awardees have won a Phase II award the following year. For more information about the ED/IES SBIR program, please see: www.ies.ed.gov/sbir Please note: the primary means of communication with Department personnel is via email.   

Please review the FAQ page to assist you in the preparation and submission of your proposal.  FAQ page: https://ies.ed.gov/small-business-innovation-research-sbir/edies-sbir-frequently-asked-questions 

This notice is not a request for proposals at this time.  Interested parties should continue to monitor this posting for updates. 

Advisory bid range

Pricing and bid posture

high confidence
$643,582 - $762,764

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$643,582
Target
$681,039
Premium
$762,764
Labor
$340,089
Direct
$31,543
Burden
$228,197
Fee + reserve
$80,264
Target $681,039Hybrid workpaper with explicit assumptions8 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Awarded-market signal for NAICS 541720 (last 12 months), benchmarked to sector 54.

12-month awarded value
$514,059
Sector total $5,898,852,482,236 • Share 0.0%
Live
Median
$153,459
P10–P90
$153,459$153,459
Volatility
Stable0%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
0.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($514,059)
Deal sizing
$153,459 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice 91990026R0004
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans
Other matched support routes

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.