Maintenance Dredging, Hudson River Federal Navigation Pro...
Federal opportunity from Public Agency. Place of performance: United States.
- Source
- Open on official portal →
- Solicitation
- 0B7JOmU6gNmaZOSPa6VK
- Performance
- United States
- Response
- No due date posted
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
Description
The U.S. Army Corps of Engineers is proposing to perform maintenance dredging of the Hudson River Federal Navigation Project. The project involves removing approximately 10,000 cubic yards of critical shoals from the Troy Lock & Dock dredging area to a depth of -14 feet COE Datum River Datum. The dredged material will be transported and placed into a New York State Dept. of Environmental Conservation (DEC) approved contractor-provided upland dredge material placement site. The contractor will... | Title: Maintenance Dredging, Hudson River Federal Navigation Project, Reach N04, Troy, NY, Agency: U.S. Department Of Defense, State: New York, Open Date: 2/9/2026, Close Date: 3/17/2026, Last Updated Date: 2/17/2026
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The U.S. Army Corps of Engineers requires maintenance dredging of the Hudson River Federal Navigation Project, specifically involving the removal of approximately 10,000 cubic yards of critical shoals from the Troy Lock & Dock area. The project is scheduled to open on 2/9/2026 and close on 3/17/2026. Successful contractors will manage the dredged materials and ensure compliance with New York State DEC regulations for placement.
The buyer aims to remove shoals to maintain safe navigation depths within the Hudson River Federal Navigation Project, ensuring proper accessibility for vessels and compliance with federal and state environmental guidelines.
- Companies experienced in dredging projects
- Firms familiar with environmental regulations in New York
- Contractors with equipment suitable for underwater dredging
- Mobilization and demobilization of equipment
- Dredging to a depth of -14 feet COE Datum River Datum
- Transport of dredged materials to upland site
- Placement of dredged materials at approved site
- Site restoration and reporting
- Cover letter
- Technical proposal including experience
- Management plan for dredged materials
- Environmental compliance plan
- Pricing proposal
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Adherence to U.S. Army Corps of Engineers standards.
- Comply with New York State DEC regulations for dredging and placement.
- Consider costs for specialized dredging equipment operations
- Factor in transportation and placement fees for dredged material
- Environmental consultants for compliance reviews
- Local subcontractors for transportation services
- Dredging equipment suppliers
- Potential environmental regulatory changes
- Logistical challenges with transportation to the placement site
- Inaccurate shoal assessments leading to project delays
- What are the specific site conditions at Troy Lock & Dock?
- What types of dredging methods are preferred by the Corps?
- Are there any anticipated environmental concerns or restrictions?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific details on the solicitation document attachment.
- Lack of guidelines for subcontractor qualifications.
- No established pricing ranges provided.
- Insufficient information on equipment specifications required.
- Not specified if there are any pre-proposal conferences.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.