A-015340 Power Plant Summer Boiler and Combustion Air Mod...
Federal opportunity from Public Agency. Place of performance: United States.
- Source
- Open on official portal →
- Solicitation
- 01kVoH4sNcRlToyQDxYS
- Performance
- United States
- Response
- No due date posted
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
Description
Click the 'Link to bid' button below for more information | Title: A-015340 Power Plant Summer Boiler and Combustion Air Modifications - OSH, Agency: The City of Osawatomie, State: Kansas, Open Date: 3/5/2026, Close Date: 3/31/2026, Last Updated Date: 3/31/2026
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity titled 'A-015340 Power Plant Summer Boiler and Combustion Air Modifications' involves a project for The City of Osawatomie, Kansas, with an open date of March 5, 2026, and a close date of March 31, 2026. This project presents a technical challenge in energy efficiency and emissions reduction in municipal facilities. Bidders should prepare to showcase relevant experience in combustion system modifications and regulatory compliance in power plant operations.
The City of Osawatomie aims to modify combustion air systems in their power plant to enhance performance and reduce emissions, thereby improving overall energy efficiency.
- Companies specialized in power plant engineering
- Firms with experience in combustion modifications
- Energy efficiency consultants
- Assess current boiler systems
- Design modifications to combustion air systems
- Implement and test modifications
- Conduct post-implementation evaluation
- Technical proposal detailing project approach
- Company qualifications and past performance
- Cost proposal with detailed pricing structure
- Compliance with local and federal regulations
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must meet local Kansas environmental regulations
- Adherence to specific power plant operational standards
- Documentation of past compliance with similar projects
- Consider fixed-price proposals to enhance competitiveness
- Be aware of potential cost fluctuations in materials and labor
- Include contingencies for regulatory compliance costs
- Partner with sub-contractors specializing in emissions control technologies
- Consider teaming with local Kansas firms for logistical advantages
- Potential delays in securing necessary permits
- Market fluctuations affecting pricing of modifications
- Challenges in meeting compliance deadlines
- What specific regulations must the modifications comply with?
- Are there existing studies or assessments related to the current boiler system?
- What is the budget range allocated for this project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed scope of modifications required
- Technical specifications for the boiler systems
- Estimated budget or funding availability
- Preferred project delivery methods
- Key decision-makers contacts
- Evaluation criteria for bids
- Potential for warranty requirements
- Impact of modifications on existing operations
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.