Skip to content
Federal Bid Partners LLCProposal & grant writing, plus GSA Schedules
City of Valdosta

RFQ#8-27 (1) 2026 Front Loader 92HP 4X4 Tractor

Solicitation: Not available
Notice ID: ca115ca817ce5f263c40a604c0b1b621
DepartmentCity of ValdostaStateGAPostedJun 11, 2026, 12:00 AM UTCDueJun 23, 2026, 03:20 PM UTCCloses in 12 daysBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from City of Valdosta. Place of performance: GA. Response deadline: Jun 23, 2026.

Source
Open on official portal →
Solicitation
ca115ca817ce5f263c40a604c0b1b621
Performance
Valdosta, GA
Response
Jun 23, 2026, 03:20 PM UTC
Open on official portal →
Map for GA
Live POP
Place of performance
Valdosta, GA
State: GA
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
City of Valdosta
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
GA20260009 (Rev 1)
Published May 18, 2026Georgia • Colquitt
7 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 5 more rate previews.
Davis-BaconBest fitstate match
GA20260009 (Rev 1)
Open WD
Published May 18, 2026Georgia • Colquitt
Rate
PLUMBER
Base $12.93Fringe $0.00
Rate
PAINTER: BRUSH ONLY
Base $10.47Fringe $0.00
Rate
OPERATOR: BACKHOE/EXCAVATOR
Base $11.89Fringe $0.00
+4 more occupation rates in this WD
Davis-Baconstate match
GA20260320 (Rev 2)
Open WD
Published May 18, 2026Georgia • Chattahoochee, Harris, Marion
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $33.90Fringe $18.80
Rate
OPERATOR: CRANE
Base $38.53Fringe $16.08
Rate
OPERATOR: FORKLIFT
Base $32.93Fringe $16.08
+19 more occupation rates in this WD
Davis-Baconstate match
GA20260027 (Rev 1)
Open WD
Published May 18, 2026Georgia • Bibb
Rate
PER HOUR ADDITIONAL
Base $32.60Fringe $15.52
Rate
PER HOUR ADDITIONAL
Base $25.49Fringe $11.73
Rate
TRUCK DRIVER
Base $12.17Fringe $0.83
+12 more occupation rates in this WD
Davis-Baconstate match
GA20260217 (Rev 1)
Open WD
Published May 18, 2026Georgia • Taliaferro, Tattnall
Rate
TRUCK DRIVER: SEMI/TRAILER TRUCK
Base $16.99Fringe $0.00
Rate
TRUCK DRIVER: WATER TRUCK
Base $11.25Fringe $0.00
Rate
TRUCK DRIVER: PICKUP TRUCK
Base $14.41Fringe $0.00
+37 more occupation rates in this WD

Description

RFQ#8-27 (1) 2026 Front Loader 92HP 4X4 Tractor

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,059,558,951
Sector total $2,059,558,951 • Share 100.0%
Live
Median
$166,345
P10–P90
$30,083$4,158,774
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,059,558,951)
Deal sizing
$166,345 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.