Skip to content
Public Agency

CUNY Kingsborough Community College Library and Media Cen...

Solicitation: 03GytUQdbF6p8PTZ34Ri
Notice ID: cba2454a5d2ba92d9cbde1346bebd2ae
Contract snapshot

Federal opportunity from Public Agency. Place of performance: United States.

Source
Open on official portal →
Solicitation
03GytUQdbF6p8PTZ34Ri
Performance
United States
Response
No due date posted
Open on official portal →
Live POP
Place of performance
United States
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Public Agency
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
No direct WD match was found yet for this notice. Review the WD directory for state/county coverage and verify on SAM.gov.

Description

THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLY

See the Eligibility Requirements further down in this document.

This is a single prime project for work located at the Library Building Kingsborough Community College.

Work includes but not limited to:

- Asbestos Abatement at various locations

- Replacement of the existing curtain walls and windows

- Replacement of the existing sloped metal roofs with associated flashings etc.

- Replacement of the existing skylight and sloped... | Title: CUNY Kingsborough Community College Library and Media Center Curtain Walls, Sloped Roofs Replacement, FISP Cycle 9C Conditions Restoration and Associated Asbestos Abatement, Agency: Dormitory Authority of the State of New York, State: New York, Open Date: 2/13/2026, Close Date: 3/13/2026, Last Updated Date: 3/7/2026

Advisory bid range

Pricing and bid posture

high confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 14, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The CUNY Kingsborough Community College project seeks expressions of interest for significant renovations, including asbestos abatement and various replacements of structural elements such as curtain walls and roofs. The project is under the Dormitory Authority of the State of New York, with a response deadline set for March 13, 2026. This serves as a prime opportunity for contractors experienced in environmental remediation and building restoration.

Asbestos AbatementBuilding RestorationCurtain Wall ReplacementSloped Roof ReplacementFISP Cycle 9C
What the buyer is trying to do

The buyer aims to find qualified contractors for renovations at the library building, addressing critical issues like asbestos abatement and structural replacements to ensure safety and compliance with FISP Cycle 9C conditions.

Who should pursue this
  • Contractors with expertise in asbestos abatement
  • Companies specializing in building restoration
  • Firms experienced in large educational institution projects
Work breakdown
  • Asbestos abatement at various locations
  • Replacement of existing curtain walls and windows
  • Replacement of existing sloped metal roofs and flashings
  • Replacement of existing skylights
  • Conditions restoration per FISP Cycle 9C guidelines
Response package checklist
  • Expression of Interest document
  • Company qualifications and past project examples
  • Relevant certifications for asbestos handling
  • Project approach and methodology overview
  • Safety and compliance plans
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must adhere to NY state regulations for asbestos abatement
  • Compliance with FISP Cycle 9C conditions required
  • Licensing and bonding requirements must be met
Pricing strategy
  • Consider government pricing standards for public projects
  • Factor in overhead costs specific to asbestos abatement
  • Prepare competitive quotes reflecting project scope and timelines
Teaming and subs
  • Engage sub-contractors specialized in asbestos removal
  • Consider partnerships with local firms familiar with state regulations
  • Involve teams experienced in FISP compliance
Risks and watchouts
  • Potential delays due to regulatory compliance
  • Risk of unforeseen asbestos contamination discovery
  • Market conditions affecting material availability and costs
Smart questions to ask
  • What specific certifications are required for contractors?
  • Are there existing design plans or assessments available for review?
  • What is the anticipated budget range for the project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed eligibility requirements
  • Specific project budget range
  • Potential penalties for non-compliance
  • Availability of design plans or assessments
  • Required certifications for potential bidders
  • Contact information for project clarifications
  • Information on local conditions affecting project work
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice 03GYTUQDBF6P8PTZ34RI
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.