Skip to content
Correction

Lumber for Westville

Solicitation: Not available
Notice ID: d230c9b3b1a72347a7c03035723bed34
DepartmentCorrectionStateINPostedDueMar 09, 2026, 10:00 PM UTCExpiredBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from Correction. Place of performance: IN. Response deadline: Mar 09, 2026.

Source
Open on official portal →
Solicitation
d230c9b3b1a72347a7c03035723bed34
Performance
IN
Response
Mar 09, 2026, 10:00 PM UTC
Open on official portal →
Live POP
Place of performance
IN
Contracting office
Not listed

Point of Contact

Name
Kiera Shontay Poindexter
Email
KPoindexter1@idoc.IN.gov
Phone
Not available

Agency & Office

Department
Correction
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
IN20260054 (Rev 1)
Published May 18, 2026Indiana • Jasper, Lake, Newton +1
16 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 14 more rate previews.
Davis-BaconBest fitstate match
IN20260054 (Rev 1)
Open WD
Published May 18, 2026Indiana • Jasper, Lake, Newton +1
Rate
CARPENTER
Base $35.08Fringe $18.50
Rate
ELECTRICIAN
Base $27.00Fringe $18.29
Rate
POWER EQUIPMENT OPERATOR: ROLLER
Base $49.05Fringe $43.40
+13 more occupation rates in this WD
Davis-Baconstate match
IN20260052 (Rev 1)
Open WD
Published May 18, 2026Indiana • Greene, Monroe, Owen
Rate
ELECTRICIAN
Base $27.00Fringe $18.29
Rate
POWER EQUIPMENT OPERATOR: LOADER
Base $49.05Fringe $43.40
Rate
POWER EQUIPMENT OPERATOR: BULLDOZER
Base $49.05Fringe $43.40
+11 more occupation rates in this WD
Davis-Baconstate match
IN20260050 (Rev 1)
Open WD
Published May 18, 2026Indiana • Clay, Sullivan, Vermillion +1
Rate
ELECTRICIAN
Base $27.00Fringe $18.29
Rate
POWER EQUIPMENT OPERATOR: LOADER
Base $49.05Fringe $43.40
Rate
POWER EQUIPMENT OPERATOR: BULLDOZER
Base $49.05Fringe $43.40
+11 more occupation rates in this WD
Davis-Baconstate match
IN20260053 (Rev 1)
Open WD
Published May 18, 2026Indiana • Howard, Tipton
Rate
CARPENTER
Base $29.49Fringe $14.21
Rate
ELECTRICIAN
Base $27.00Fringe $18.29
Rate
POWER EQUIPMENT OPERATOR: LOADER
Base $49.05Fringe $43.40
+11 more occupation rates in this WD

Description

RFQ# 86803 The goal is to obtain Lumber needed for the new Westville Building currently under construction. Questions can be emailed to Kiera Poindexter at kpoindexter1@idoc.in.gov or Kevin Orme at KOrme@idoc.in.gov. Completed bids can be emailed to Kiera Poindexter at kpoindexter1@idoc.in.gov. A completed bid package MUST be submitted by the due date/time. The bid package is available for download through the Bid documents link in the Event Name column. This bid is not eligible for electronic bid through the supplier portal.

Advisory bid range

Pricing and bid posture

high confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,516,281,615
Sector total $3,516,281,615 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,459$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,516,281,615)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 13, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Indiana Department of Correction is seeking proposals for lumber for the new Westville Building currently under construction, as indicated in RFQ# 86803. Bids must be submitted via email to the specified contacts by March 9, 2026. This opportunity is crucial for contractors specializing in construction materials and delivery.

lumberWestville Buildingconstruction materialsIndiana Department of CorrectionRFQ# 86803
What the buyer is trying to do

The buyer aims to procure quality lumber for a construction project to support the building of the new Westville facility.

Who should pursue this
  • Construction material suppliers
  • Wholesalers of lumber
  • Companies specializing in building materials for institutional projects
Work breakdown
  • Identify the type and quantity of lumber required
  • Ensure compliance with construction specifications
  • Prepare an accurate and complete bid package
  • Submit the bid via email before the deadline
Response package checklist
  • Completed bid package
  • Pricing information
  • Delivery terms
  • Company qualifications and experience
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Bid is not eligible for electronic submission.
  • Bids must be sent to provided email addresses.
Pricing strategy
  • Consider competitive pricing for bulk lumber acquisition.
  • Factor in delivery logistics to the Westville site.
Teaming and subs
  • Local delivery partners for timely logistics
  • Specialty lumber providers for specific wood types
Risks and watchouts
  • Potential for delays if lumber types are backordered
  • Risk of bid rejection due to non-compliance with submission guidelines
  • Volatility in lumber prices affecting overall bid competitiveness
Smart questions to ask
  • What specific types of lumber are required (e.g., dimensions, treatments)?
  • Are there preferred suppliers or standards for quality?
  • What are the expected delivery timelines for the lumber?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific types and quantities of lumber needed
  • Details on evaluation criteria for bids
  • Clarifications on delivery specifications or timelines
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.