USCGC MUNRO MOORING LINES
Solicitation from US COAST GUARD • HOMELAND SECURITY, DEPARTMENT OF. Place of performance: CA. Response deadline: Feb 17, 2026. Industry: NAICS 336611 • PSC 2090.
- Source
- Open on SAM.gov →
- Solicitation
- 70Z08526PLREP0064
- Performance
- California • 94501 United States
- Response
- Feb 17, 2026, 08:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 127 more rate previews.↓
More in NAICS 336611
Description
The purpose of this is to replace MUNRO’s mooring lines.
Scope of Services
- Manufacturing of made to order lines specifications below.
- SAMSON STABLE BRAID UNCOATED, 1-1/2 INCH DIAMETER
- 600 FEET OVERALL LENGTH UNCOATED WHITE/CLEAR
- 6 FOOT COR-GARD SIZE 3 BLUE COVERED EYE EACH END
- SPLICE METHOD: DOUBLE BRAID CLASS I
- MINIMUM BREAK STRENGTH: 64200 LBS
- FIBER TYPE (CORE/COVER): POLYESTER / POLYESTER
- ESTIMATED GROSS WEIGHT: 457 LBS
- ESTIMATED DIMENSIONS PER UNIT: 35x35x26 INCHES
- Quantity: 06
- Delivery of new lines.
- 30 day lead time is requested from time of contracted order
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Awarded-market signal for NAICS 336611 (last 12 months), benchmarked to sector 33.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The US Coast Guard is seeking to replace the mooring lines for the USCGC Munro, with a solicitation posted on February 7, 2026, and a response deadline of February 17, 2026. The required product involves six made-to-order mooring lines adhering to specific dimensions and strength requirements. Bidders must be familiar with manufacturing specifications relevant to marine materials, particularly polyester fiber types.
The buyer aims to procure six new mooring lines that meet precise specifications and standards for the USCGC Munro, facilitating the vessel's mooring operations.
- Companies specializing in marine rope manufacturing
- Firms with experience in federal contracting under SBA set-aside
- Businesses with a proven track record of meeting stringent manufacturing specs
- Manufacturing of six mooring lines
- Adhering to specified dimensions and strength
- Quality assurance and testing of materials
- Delivery within a 30-day lead time after contract award
- Detailed specifications of proposed mooring lines
- Evidence of previous relevant contracts
- Lead time confirmation
- Compliance with break strength requirements
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Must meet 'SAMSON STABLE BRAID UNCOATED' specifications
- Double braid splice method is required
- Must ensure minimum break strength of 64,200 lbs
- Consider competitive pricing due to government solicitation
- Factor in costs associated with material sourcing and manufacturing lead time
- Potential volume discounts may be negotiable for future contracts
- Consider partnerships with local manufacturers familiar with federal contracts
- Leverage expertise from companies specializing in marine product certifications
- Potential delays in manufacturing may impact delivery timelines
- Failure to meet minimum strength requirements could lead to rejection of the bid
- Inaccurate assessment of material costs may affect profit margins
- What are the potential penalties for late delivery?
- Are there specific certifications required for the materials used?
- Can we get clarification on the evaluation criteria for bids?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific performance period start and end dates are not mentioned
- Further details on delivery location are not provided
- No information on warranty or maintenance requirements
- Regulatory compliance details are absent
- Clarification on packaging and shipping requirements is unclear
- Lack of information on payment terms and conditions
- No details regarding the evaluation criteria for proposals
- Information on handling late deliveries is missing
Service match
Optional support routes matched to this notice after the core solicitation details.
Other matched support routes↓
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.