Skip to content
Department of Veterans Affairs

Z2DA--519-23-908 EHRM Tier 2 Data Center Construction - Big Spring

Solicitation: 36C77626C0028
Notice ID: ea82deea9c2a43528e804bbb46082e55
Contract snapshot

Award Notice from VETERANS AFFAIRS, DEPARTMENT OF • VETERANS AFFAIRS, DEPARTMENT OF. Place of performance: TX. Industry: NAICS 236220 • PSC Z2DA.

Source
Open on SAM.gov →
Solicitation
36C77626C0028
Performance
Big Spring, Texas • 79720 United States
Response
No due date posted
Open on SAM.gov →
Map for TX
Live POP
Place of performance
Big Spring, Texas • 79720 United States
State: TX
Contracting office
Independence, OH • 44131 USA

Point of Contact

Name
Danielle Negron
Email
danielle.negron@va.gov
Phone
Not available

Agency & Office

Department
VETERANS AFFAIRS, DEPARTMENT OF
Agency
VETERANS AFFAIRS, DEPARTMENT OF
Subagency
PCAC (36C776)
Office
Not available
Contracting Office Address
Independence, OH
44131 USA

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
TX20260147 (Rev 1)
Published May 18, 2026Texas • Gray
23 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 21 more rate previews.
Davis-BaconBest fitstate match
TX20260147 (Rev 1)
Open WD
Published May 18, 2026Texas • Gray
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $33.23Fringe $7.52
Rate
BOILERMAKER (COLEMAN AND CONCHO COUNTIES)
Base $33.70Fringe $24.41
Rate
CARPENTER
Base $28.57Fringe $9.30
+20 more occupation rates in this WD
Davis-Baconstate match
TX20260297 (Rev 1)
Open WD
Published May 18, 2026Texas • Brooks, Dimmit, Duval +11
Rate
WORK ZONE BARRICADE SERVICER
Base $16.49Fringe $0.00
Rate
TRUCK DRIVER, SINGLE OR TANDEM AXLE DUMP TRUCK
Base $18.63Fringe $0.00
Rate
TRUCK DRIVER, SINGLE AXLE
Base $19.02Fringe $0.00
+30 more occupation rates in this WD
Davis-Baconstate match
TX20260134 (Rev 1)
Open WD
Published May 18, 2026Texas • Duval
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.50Fringe $8.89
Rate
BOILERMAKER
Base $33.17Fringe $24.92
Rate
IRONWORKER: REINFORCING AND STRUCTURAL
Base $27.95Fringe $8.03
+20 more occupation rates in this WD
Davis-Baconstate match
TX20260155 (Rev 1)
Open WD
Published May 18, 2026Texas • Houston
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $33.23Fringe $7.52
Rate
BOILERMAKER
Base $33.17Fringe $24.92
Rate
CARPENTER (FORM WORK ONLY)
Base $33.27Fringe $9.73
+22 more occupation rates in this WD

More in NAICS 236220

Description

Award Notice.

Award Info

Awardee
V LINE SERVICES L.L.C.
Amount
$4,329,750
Award #
36C77626C0028
Award Date
2026-03-17
Advisory bid range

Pricing and bid posture

medium confidence
$625,611 - $741,464

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$625,611
Target
$662,022
Premium
$741,464
Labor
$329,680
Direct
$32,000
Burden
$221,360
Fee + reserve
$78,022
Target $662,022Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Awarded-market signal for NAICS 236220 (last 12 months), benchmarked to sector 23.

12-month awarded value
$29,488,666,050
Sector total $38,146,042,590 • Share 77.3%
Live
Median
$13,937,035
P10–P90
$5,336,612$32,702,117
Volatility
Volatile196%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
77.3%
share
Momentum (last 3 vs prior 3 buckets)
-92%(-$24,882,260,482)
Deal size index
0.31× median
Award vs latest median (a sizing reference).
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice 36C77626C0028
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans
Other matched support routes

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.