Skip to content
Public Agency

RFP for City of Mount Vernon, NY Comprehensive Update of...

Solicitation: 04vFqUjACjvg5APe2tTX
Notice ID: eaf2505af2c6d7f9114cbfe08c851218
Contract snapshot

Federal opportunity from Public Agency. Place of performance: United States.

Source
Open on official portal →
Solicitation
04vFqUjACjvg5APe2tTX
Performance
United States
Response
No due date posted
Open on official portal →
Live POP
Place of performance
United States
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Public Agency
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
No direct WD match was found yet for this notice. Review the WD directory for state/county coverage and verify on SAM.gov.

Description

The City of Mount Vernon is seeking a professional planning and zoning consulting services to comprehensively update and modernize its Zoning Ordinance. The selected consultant will review the City’s existing zoning regulations and develop a new ordinance that aligns with the vision, goals, and land use framework of the City’s recently adopted Comprehensive Plan. The work will include evaluating current zoning districts, land use regulations, and development standards; identifying gaps or out... | Title: RFP for City of Mount Vernon, NY Comprehensive Update of Zoning Ordinance, Agency: City of Mount Vernon, NY, State: New York, Open Date: 3/5/2026, Close Date: 4/10/2026, Last Updated Date: 4/7/2026

Advisory bid range

Pricing and bid posture

high confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: May 12, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The City of Mount Vernon, NY is seeking a consultant to update its Zoning Ordinance, with a focus on aligning with the new land use framework from the Comprehensive Plan. The opportunity is open for proposals from 3/5/2026, with a response deadline of 4/10/2026. This initiative requires thorough evaluation of current zoning practices and the development of a new ordinance.

Zoning OrdinanceComprehensive PlanLand Use RegulationsUrban PlanningConsulting Services
What the buyer is trying to do

The buyer aims to comprehensively update its Zoning Ordinance to modernize regulations in line with the recently adopted Comprehensive Plan.

Who should pursue this
  • Urban planning firms
  • Land use consultants
  • Architecture and planning agencies with zoning expertise
Work breakdown
  • Review existing zoning regulations
  • Develop a new zoning ordinance
  • Evaluate current zoning districts
  • Assess land use regulations
  • Identify gaps in the current zoning practices
  • Align new regulations with the City's goals
Response package checklist
  • Company qualifications and experience
  • Proposed methodology for zoning update
  • Timeline for deliverables
  • Staff qualifications
  • References or case studies of similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure familiarity with local zoning laws and regulations
  • Align proposal with the objectives of the Comprehensive Plan
  • Adhere to submission requirements by the deadline
Pricing strategy
  • Consider competitive pricing in alignment with municipal budgets
  • Evaluate value-based pricing to reflect comprehensive services offered
Teaming and subs
  • Consider partnering with local firms for insights into community needs
  • Subcontracting to specialists in zoning law or urban design may enhance proposal strength
Risks and watchouts
  • Potential resistance from stakeholders in the community regarding zoning changes
  • Inaccurate assessment of current regulations may lead to delays
  • Failure to align with the Comprehensive Plan could result in non-acceptance
Smart questions to ask
  • What are the main goals of the City’s Comprehensive Plan that should influence the new ordinance?
  • Are there specific community concerns or priorities that need to be addressed?
  • What is the approval timeline after submission of the new ordinance?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed scope of the current zoning regulations
  • Specific regulations or standards to be emphasized or changed
  • Budget constraints or funded ceiling for the project
  • Criteria for evaluation of proposals
  • Any required certifications or qualifications for bidders
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice 04VFQUJACJVG5APE2TTX
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.