Skip to content
Federal Bid Partners LLCProposal & grant writing, plus GSA Schedules
Department of Transportation

CHANGE ORDER NOTICE Portable Toilets for D1

Solicitation: Not available
Notice ID: 26-494DOT-FINAD-B-52415
Contract snapshot

Federal opportunity from FINADMIN494 - Finance & Administration • DOT - Transportation. Place of performance: IL. Response deadline: Jun 22, 2026.

Source
Open on official portal →
Solicitation
26-494DOT-FINAD-B-52415
Performance
S. Wentworth Ave Chicago, IL 60621
Response
Jun 22, 2026, 12:00 PM UTC
Open on official portal →
Map for IL
Live POP
Place of performance
S. Wentworth Ave Chicago, IL 60621
State: IL
Contracting office
Not listed

Point of Contact

Name
Timothy Neisler
Email
Not available
Phone
Not available

Agency & Office

Department
DOT - Transportation
Agency
FINADMIN494 - Finance & Administration
Subagency
FINADMIN494 - Finance & Administration
Office
AK001 - Budget & Fiscal Management
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
IL20260060 (Rev 1)
Published May 18, 2026Illinois • Clark, Douglas, Edgar
16 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 14 more rate previews.
Davis-BaconBest fitstate match
IL20260060 (Rev 1)
Open WD
Published May 18, 2026Illinois • Clark, Douglas, Edgar
Rate
BRICKLAYER (CLARK COUNTY)
Base $31.56Fringe $22.28
Rate
BRICKLAYER (DOUGLAS AND EDGAR COUNTIES)
Base $32.45Fringe $24.43
Rate
CARPENTER (EDGAR COUNTY)
Base $33.40Fringe $24.85
+13 more occupation rates in this WD
Davis-Baconstate match
IL20260001 (Rev 4)
Open WD
Published May 18, 2026Illinois • Adams, Bond, Boone +43
Rate
AL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (BUREAU, DE KALB, LA SALLE, LEE, LIVINGSTON AND PUTNAM COUNTIES)
Base $41.27Fringe $32.76
Rate
FIRE STOP TECHNICIAN (BUREAU, DE KALB, LA SALLE, LEE, LIVINGSTON AND PUTNAM COUNTIES)
Base $44.02Fringe $32.76
Rate
R: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (BUREAU, DE KALB, LA SALLE, LEE, LIVINGSTON AND PUTNAM COUNTIES)
Base $55.02Fringe $35.75
+315 more occupation rates in this WD
Davis-Baconstate match
IL20260027 (Rev 2)
Open WD
Published May 18, 2026Illinois • Jackson
Rate
BRICKLAYER
Base $30.79Fringe $21.69
Rate
ELECTRICIAN (WORK NOT TO EXCEED 8-PLEX FAMILY HOUSING UNITS)
Base $32.58Fringe $12.11
Rate
ELECTRICIAN (ALL OTHER WORK)
Base $44.99Fringe $23.48
+7 more occupation rates in this WD
Davis-Baconstate match
IL20260057 (Rev 2)
Open WD
Published May 18, 2026Illinois • Monroe
Rate
ELECTRICIAN
Base $35.73Fringe $19.66
Rate
UT MACHINES REGARDLESS OF SIZE, NAIL LAUNCHERS WHEN MOUNTED ON A MACHINE OR SELF-PROPELLED, CON-COVER MACHINES, GOLDHOFER AND SIMILAR S.P.M.T. (SELF-PROPELLED MODULAR TRANSPMIERS) HEAVY TRANSPORT UNITS
Base $40.95Fringe $34.95
Rate
PREMIMUM
Base $29.95Fringe $17.12
+7 more occupation rates in this WD

Description

CHANGE ORDER NOTICE Portable Toilets for D1 CHANGE ORDER NOTICE: This change order is for an additional cost to the original contract P-81018 for a two (2) month rental extension of portable restroom trailers and restroom service. Item # 1: ( 977 - 73 ) This change order is for an additional cost to the original contract P-81018 for an extension of portable restroom trailers and restroom service. This change order is for an additional cost to the original contract P-81018 for an extension of portable restroom trailers and restroom service.

Advisory bid range

Pricing and bid posture

high confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,061,791,448
Sector total $2,061,791,448 • Share 100.0%
Live
Median
$205,632
P10–P90
$30,120$4,158,774
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,061,791,448)
Deal sizing
$205,632 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.