Skip to content
Office Of The Controller

Crop Fertilizer for RCC Farm

Solicitation: Not available
Notice ID: ky_vss__RFB-758-2600000571-1
Contract snapshot

Federal opportunity from Finance Ofc of Procurement Svc • Office Of The Controller. Place of performance: KY. Response deadline: May 14, 2026.

Source
Open on official portal →
Solicitation
ky_vss__RFB-758-2600000571-1
Performance
Bid Receiving, See Terms & Conditions for Bid Submission Instructions, Other, KY
Response
May 14, 2026, 05:30 PM UTC
Open on official portal →
Map for KY
Live POP
Place of performance
Bid Receiving, See Terms & Conditions for Bid Submission Instructions, Other, KY
State: KY
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Office Of The Controller
Agency
Finance Ofc of Procurement Svc
Subagency
Finance Ofc of Procurement Svc
Office
Keith Srutowski | keith.srutowski@ky.gov | 502-564-7007
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
KY20260088 (Rev 2)
Published May 18, 2026Kentucky • Campbell
35 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 33 more rate previews.
Davis-BaconBest fitstate match
KY20260088 (Rev 2)
Open WD
Published May 18, 2026Kentucky • Campbell
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $35.23Fringe $23.04
Rate
BOILERMAKER
Base $43.85Fringe $28.44
Rate
BRICKLAYER
Base $35.00Fringe $17.13
+32 more occupation rates in this WD
Davis-Baconstate match
KY20260025 (Rev 1)
Open WD
Published May 18, 2026Kentucky • Laurel
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.24Fringe $18.54
Rate
BOILERMAKER
Base $43.85Fringe $28.44
Rate
CARPENTER (INCLUDES FORM WORK, EXCLUDES ACOUSTICAL CEILING INSTALLATION)
Base $32.25Fringe $18.09
+33 more occupation rates in this WD
Davis-Baconstate match
KY20260054 (Rev 1)
Open WD
Published May 18, 2026Kentucky • Monroe
Rate
CARPENTER (FORM WORK ONLY)
Base $33.89Fringe $24.06
Rate
LINE CONSTRUCTION: LINEMAN
Base $43.84Fringe $18.80
Rate
LINE CONSTRUCTION: GROUNDMAN
Base $25.77Fringe $14.10
+14 more occupation rates in this WD
Davis-Baconstate match
KY20260016 (Rev 1)
Open WD
Published May 18, 2026Kentucky • Hardin, Larue
Rate
ABOVE RATE REGARDLESS OF BOOM LENGTH
Base $33.90Fringe $17.85
Rate
CEMENT MASON/CONCRETE FINISHER
Base $27.80Fringe $18.71
Rate
PLUMBER
Base $41.90Fringe $24.89
+13 more occupation rates in this WD

Description

46-0-0 Urea Granular Bulk Price is inclusive of all shipping and delivery charges. 18-46-0 DAP (Diammonium Phosphate) Postemergence control against glyphosate resistant weeds Price is inclusive of all shipping and delivery charges. 0-0-60 Muriate of Potash Common crop fertilizer used to promote healthy stem development in plants. Price is inclusive of all shipping and delivery charges. Agricultural Lime Used to neutralize acidity and replenish calcium and magnesium in the soil. Price is inclusive of all shipping and delivery charges. Spreading of fertilizer on fields by the vendor, per acre.

Advisory bid range

Pricing and bid posture

high confidence
$263,959 - $312,841

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$263,959
Target
$279,322
Premium
$312,841
Labor
$13,680
Direct
$183,000
Burden
$29,383
Fee + reserve
$32,919
Target $279,322Hybrid workpaper with explicit assumptions3 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,516,281,615
Sector total $3,516,281,615 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,459$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,516,281,615)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.