Roger Conant (667-6) Paving Project #030128
Federal opportunity from BHA11 - Beverly Housing Authority • Beverly Housing Authority. Place of performance: MA. Response deadline: Mar 13, 2026. Industry: Source industry codes 72, 14, 11.
- Source
- Open on official portal →
- Solicitation
- BD-25-1955-BHA11-BHA11-125492
- Performance
- R Rear Bridge Street Beverly, MA 01915
- Response
- Mar 13, 2026, 01:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 5 more rate previews.↓
Description
Remove and reconstruct bituminous parking lot, drive aisles, and sidewalks. Construct concrete dumpster pad. Install removeable bollards, wood fence dumpster enclosure. Railings. Pavement markings, loam and hydroseed. install new granite curb, remove and reset granite curb. Signage. Catch basin reconstruction. Other associated site items.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Beverly Housing Authority has issued a solicitation for the Roger Conant Paving Project #030128, focusing on the comprehensive reconstruction of a bituminous parking lot and associated site enhancements. Key deliverables include the construction of a concrete dumpster pad and the installation of various site elements such as railings and pavement markings. Proposals are due by March 13, 2026, and interested parties can access the detailed bid document through the provided link.
The buyer aims to enhance the functionality and safety of the parking lot and adjacent areas through reconstruction and installation of improved site features, ensuring compliance with modern standards.
- Contractors experienced in asphalt and concrete work
- Firms with expertise in site development and landscaping
- Companies that can meet the project timeline and compliance standards
- Remove existing bituminous parking lot
- Reconstruct parking lot and drive aisles
- Install concrete dumpster pad
- Erect removable bollards and wood fence enclosure
- Install railings and signage
- Conduct catch basin reconstruction
- Apply pavement markings and loam with hydroseed
- Remove and reset granite curb and install new granite curb
- Company profile and relevant project experience
- Detailed project plan and timeline
- Proposed pricing structure
- Compliance with local regulations and standards
- Team qualifications and references
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Check for compliance with local construction codes
- Ensure adherence to environmental regulations during site work
- Verify safety measures are included in the proposal
- Calculate costs based on material and labor estimates for reconstruction
- Consider competitive pricing while ensuring quality delivery
- Factor in overhead and project management costs
- Consider partnering with local material suppliers for asphalt and concrete
- Subcontract with landscaping firms for loam and hydroseeding
- Engage site safety experts to ensure compliance throughout the project
- Delays in procurement of materials could impact project timeline
- Weather conditions affecting project work schedule
- Potential underestimation of labor requirements
- What are the specific materials preferred for the asphalt and concrete tasks?
- Are there local subcontractors recommended for specific tasks?
- What are the penalties for delay based on the proposed timeline?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific budget information for the project
- Detailed evaluation criteria for proposals
- Any necessary permits required prior to project commencement
- Information about site access and operational hours
- Clarification on warranty or maintenance requirements post-project
Service match
Optional support routes matched to this notice after the core solicitation details.
Other matched support routes↓
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.