Skip to content
Beverly Housing Authority

Roger Conant (667-6) Paving Project #030128

Solicitation: BD-25-1955-BHA11-BHA11-125492
Notice ID: ma_commbuys_0c87906844c35dfbc359
Source codes72, 14, 11DepartmentBeverly Housing AuthorityAgencyBHA11 - Beverly Housing AuthorityStateMAPostedFeb 18, 2026, 10:00 AM UTCDueMar 13, 2026, 01:00 PM UTCExpiredBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from BHA11 - Beverly Housing Authority • Beverly Housing Authority. Place of performance: MA. Response deadline: Mar 13, 2026. Industry: Source industry codes 72, 14, 11.

Source
Open on official portal →
Solicitation
BD-25-1955-BHA11-BHA11-125492
Performance
R Rear Bridge Street Beverly, MA 01915
Response
Mar 13, 2026, 01:00 PM UTC
Open on official portal →
Map for MA
Live POP
Place of performance
R Rear Bridge Street Beverly, MA 01915
State: MA
Contracting office
Bruce McCarrier 137R Rear Bridge Street Beverly, MA 01915 US

Point of Contact

Name
dgoodwin
Email
dgoodwin@beverlyhousing.net
Phone
Not available

Agency & Office

Department
Beverly Housing Authority
Agency
BHA11 - Beverly Housing Authority
Subagency
BHA11 - Beverly Housing Authority
Office
BHA11 - Beverly Housing Authority
Contracting Office Address
Bruce McCarrier 137R Rear Bridge Street Beverly, MA 01915 US

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260006 (Rev 2)
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
7 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 5 more rate previews.
Davis-BaconBest fitstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD
Davis-Baconstate match
MA20260025 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Worcester
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260001 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
TOR/ASBESTOS WORKER (ZONE B) ZONE B- BARNSTABLE COUNTY (BARNSTABLE, BOURNE, FALMOUTH, MASHPEE, SANDWICH), BRISTOL COUNTY (ALL CITIES EXCEPT EASTON),AND NORFOLK COUNTY (BELLINGHAM, FRANKLIN, PLAINVILLE)
Base $55.45Fringe $36.63
Rate
OOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBOROUGH, HOLBROOK, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHAM, NORFOLK, NORWOOD, QUINCY, RANDOLPH, SHARON, STOUGHTON, WALPOLE, WELLESLEY, WESTWOOD, WEYMOUTH)
Base $55.45Fringe $36.63
Rate
URO, WELLFLEET AND YARMOUTH); BRISTOL (EASTON); ESSEX; MIDDLESEX; NORFOLK (AVON, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, HOLBROOK, HULL, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHA
Base $55.45Fringe $36.63
+87 more occupation rates in this WD

Description

Remove and reconstruct bituminous parking lot, drive aisles, and sidewalks. Construct concrete dumpster pad. Install removeable bollards, wood fence dumpster enclosure. Railings. Pavement markings, loam and hydroseed. install new granite curb, remove and reset granite curb. Signage. Catch basin reconstruction. Other associated site items.

Advisory bid range

Pricing and bid posture

high confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,474,911
Sector total $3,515,474,911 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,474,911)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 19, 2026
Client-ready brief
Executive summary
high confidencegpt 4o mini

The Beverly Housing Authority has issued a solicitation for the Roger Conant Paving Project #030128, focusing on the comprehensive reconstruction of a bituminous parking lot and associated site enhancements. Key deliverables include the construction of a concrete dumpster pad and the installation of various site elements such as railings and pavement markings. Proposals are due by March 13, 2026, and interested parties can access the detailed bid document through the provided link.

pavingasphaltconstructionsite developmentlandscapingdumpster padsource codes 72, 14, 11
What the buyer is trying to do

The buyer aims to enhance the functionality and safety of the parking lot and adjacent areas through reconstruction and installation of improved site features, ensuring compliance with modern standards.

Who should pursue this
  • Contractors experienced in asphalt and concrete work
  • Firms with expertise in site development and landscaping
  • Companies that can meet the project timeline and compliance standards
Work breakdown
  • Remove existing bituminous parking lot
  • Reconstruct parking lot and drive aisles
  • Install concrete dumpster pad
  • Erect removable bollards and wood fence enclosure
  • Install railings and signage
  • Conduct catch basin reconstruction
  • Apply pavement markings and loam with hydroseed
  • Remove and reset granite curb and install new granite curb
Response package checklist
  • Company profile and relevant project experience
  • Detailed project plan and timeline
  • Proposed pricing structure
  • Compliance with local regulations and standards
  • Team qualifications and references
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Check for compliance with local construction codes
  • Ensure adherence to environmental regulations during site work
  • Verify safety measures are included in the proposal
Pricing strategy
  • Calculate costs based on material and labor estimates for reconstruction
  • Consider competitive pricing while ensuring quality delivery
  • Factor in overhead and project management costs
Teaming and subs
  • Consider partnering with local material suppliers for asphalt and concrete
  • Subcontract with landscaping firms for loam and hydroseeding
  • Engage site safety experts to ensure compliance throughout the project
Risks and watchouts
  • Delays in procurement of materials could impact project timeline
  • Weather conditions affecting project work schedule
  • Potential underestimation of labor requirements
Smart questions to ask
  • What are the specific materials preferred for the asphalt and concrete tasks?
  • Are there local subcontractors recommended for specific tasks?
  • What are the penalties for delay based on the proposed timeline?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific budget information for the project
  • Detailed evaluation criteria for proposals
  • Any necessary permits required prior to project commencement
  • Information about site access and operational hours
  • Clarification on warranty or maintenance requirements post-project
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-25-1955-BHA11-BHA11-125492
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans
Other matched support routes

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.