Skip to content
Boston Housing Authority

BHA RFP #2449-01 Restore Rebuild Projects in City of Boston

Solicitation: BD-22-1129-PR001-BHA01-129184
Notice ID: ma_commbuys_cc78d0499c966ccad684
DepartmentBoston Housing AuthorityStateMAPostedDueAug 05, 2026, 12:00 AM UTCCloses in 71 daysBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from Boston Housing Authority. Place of performance: MA. Response deadline: Aug 05, 2026.

Source
Open on official portal →
Solicitation
BD-22-1129-PR001-BHA01-129184
Performance
MA
Response
Aug 05, 2026, 12:00 AM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
Guillermo Rower
Email
Not available
Phone
Not available

Agency & Office

Department
Boston Housing Authority
Agency
Not available
Subagency
Not available
Office
Guillermo Rower
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

BHA RFP #2449-01 Restore Rebuild Projects in City of Boston

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: May 25, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Boston Housing Authority (BHA) is seeking proposals for the Restore Rebuild Projects under RFP #2449-01, which is a crucial initiative in the City of Boston. The proposal submission deadline is set for August 5, 2026. This opportunity presents a chance for contractors specialized in restoration and rebuilding to support urban housing efforts.

Boston Housing Authorityrestorationurban rebuildingpublic housingconstruction bid
What the buyer is trying to do

The BHA is aiming to engage contractors to restore and rebuild projects within the City of Boston, enhancing residential structures and community landmarks.

Who should pursue this
  • Contractors with experience in urban restoration
  • Firms specializing in residential construction
  • Local businesses familiar with Boston regulations
Work breakdown
  • Assessment of existing structures
  • Planning and design for restoration
  • Execution of rebuilding efforts
  • Post-completion evaluations and adjustments
Response package checklist
  • Completed proposal form
  • Evidence of relevant experience
  • Proof of insurance and bonding
  • Detailed project timeline
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adherence to local safety regulations
  • Compliance with labor laws specific to the City of Boston
Pricing strategy
  • Consider local market rates for labor and materials
  • Include contingency costs for unforeseen issues
Teaming and subs
  • Engage with local subcontractors for specialized services
  • Form partnerships with firms experienced in public funding projects
Risks and watchouts
  • Potential delays due to local regulations
  • Impact of unpredictable weather on timelines
  • Changes in project scope after bidding
Smart questions to ask
  • What specific project sites are included in the scope?
  • What are the anticipated community engagement requirements?
  • Are there preferred materials or methods mandated by the BHA?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No details on project scope specifics
  • Lack of historical data on previous projects
  • Unsure about available budget or funding sources
  • No information on preferred contractor qualifications
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-22-1129-PR001-BHA01-129184
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.