Skip to content
City of Boston

IFB - HIGHWAY FENCES, GUARDRAILS, IMPACT ATTENUATORS

Solicitation: BD-26-1142-311-311-129093
Notice ID: ma_commbuys_ddeeeee4ee08ea6355c7
DepartmentCity of BostonStateMAPostedDueMay 28, 2026, 11:00 AM UTCCloses in 2 daysBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from City of Boston. Place of performance: MA. Response deadline: May 28, 2026.

Source
Open on official portal →
Solicitation
BD-26-1142-311-311-129093
Performance
MA
Response
May 28, 2026, 11:00 AM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
City Record Admin
Email
Not available
Phone
Not available

Agency & Office

Department
City of Boston
Agency
Not available
Subagency
Not available
Office
City Record Admin
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

IFB - HIGHWAY FENCES, GUARDRAILS, IMPACT ATTENUATORS

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: May 24, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The City of Boston has issued an Invitation for Bid (IFB) for the installation of highway fences, guardrails, and impact attenuators. The response deadline for this solicitation is May 28, 2026. Bidders should prepare to demonstrate experience and capacity in highway safety installations as part of their submission.

highway safetyguardrailsimpact attenuatorsmunicipal contractsinfrastructure installation
What the buyer is trying to do

The City of Boston aims to enhance roadway safety through the installation of highway fencing, guardrails, and impact attenuators, ensuring protection for both vehicles and pedestrians.

Who should pursue this
  • Contractors specializing in roadway safety installations.
  • Firms with experience in municipal infrastructure projects.
  • Companies with a strong safety record and relevant certifications.
Work breakdown
  • Review project requirements outlined in the IFB.
  • Prepare technical proposal addressing installation methods for fences, guardrails, and attenuators.
  • Compile pricing for materials and labor.
  • Submit compliance documentation as required by the City of Boston.
Response package checklist
  • Completed bid form.
  • Technical proposal detailing installation approach.
  • Pricing sheet with detailed cost breakdown.
  • Compliance documentation and safety records.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure adherence to local safety regulations.
  • Maintain documentation of prior contracts for similar projects.
  • Provide proof of insurance and bonding.
Pricing strategy
  • Consider competitive pricing while ensuring all costs are covered.
  • Assess previous bids for similar projects to determine competitive rates.
Teaming and subs
  • Partner with local suppliers for materials.
  • Engage subcontractors experienced in highway safety installations.
Risks and watchouts
  • Potential delays due to permitting processes.
  • Risk of cost overruns if material prices change significantly.
  • Ensure clarity on scope to avoid disputes during project execution.
Smart questions to ask
  • What are the specific performance standards required for the installations?
  • Are there existing maintenance contracts for the infrastructure that could influence bidding?
  • What is the timeline for review and award of bids?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed specifications for fences, guardrails, and impact attenuators.
  • Performance standards required for installation.
  • Budget or estimated value for the project.
  • Pre-bid meeting details or site visit information.
  • Information on any existing contractors involved.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1142-311-311-129093
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.