Skip to content
City of Boston

IFB - PFD - ENGINE 21 RETAINING WALL

Solicitation: BD-26-1142-PFD01-PFD01-128219
Notice ID: ma_commbuys_5989df52760568919d15
DepartmentCity of BostonStateMAPostedDueMay 21, 2026, 12:00 PM UTCExpiredBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from City of Boston. Place of performance: MA. Response deadline: May 21, 2026.

Source
Open on official portal →
Solicitation
BD-26-1142-PFD01-PFD01-128219
Performance
MA
Response
May 21, 2026, 12:00 PM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
City Record Admin
Email
Not available
Phone
Not available

Agency & Office

Department
City of Boston
Agency
Not available
Subagency
Not available
Office
City Record Admin
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260006 (Rev 2)
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
7 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 5 more rate previews.
Davis-BaconBest fitstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD
Davis-Baconstate match
MA20260025 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Worcester
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
inges POWER EQUIPMENT OPERATORS: CRANE A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY
Base $46.38Fringe $31.04
Rate
POWER EQUIPMENT OPERATORS: (4) ROLLER A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY
Base $39.12Fringe $31.04
+8 more occupation rates in this WD
Davis-Baconstate match
MA20260001 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
TOR/ASBESTOS WORKER (ZONE B) ZONE B- BARNSTABLE COUNTY (BARNSTABLE, BOURNE, FALMOUTH, MASHPEE, SANDWICH), BRISTOL COUNTY (ALL CITIES EXCEPT EASTON),AND NORFOLK COUNTY (BELLINGHAM, FRANKLIN, PLAINVILLE)
Base $55.45Fringe $36.63
Rate
OOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBOROUGH, HOLBROOK, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHAM, NORFOLK, NORWOOD, QUINCY, RANDOLPH, SHARON, STOUGHTON, WALPOLE, WELLESLEY, WESTWOOD, WEYMOUTH)
Base $55.45Fringe $36.63
Rate
URO, WELLFLEET AND YARMOUTH); BRISTOL (EASTON); ESSEX; MIDDLESEX; NORFOLK (AVON, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, HOLBROOK, HULL, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHA
Base $55.45Fringe $36.63
+87 more occupation rates in this WD

Description

IFB - PFD - ENGINE 21 RETAINING WALL

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,516,281,615
Sector total $3,516,281,615 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,459$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,516,281,615)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 21, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The Public Facilities Department (PFD01) is soliciting bids for the ENGINE 21 RETAINING WALL project, identified as Project No. 7321. Bidders are required to submit their proposals electronically by May 21, 2026. Interested parties can find additional information and access bid documents through the provided links and contact details.

Retaining WallPublic FacilitiesConstruction BidCivil EngineeringElectronic Bidding
What the buyer is trying to do

The buyer aims to construct a retaining wall as part of the ENGINE 21 project, ensuring structural integrity and compliance with regulatory standards.

Who should pursue this
  • Construction firms with experience in retaining wall projects
  • General contractors specializing in civil infrastructure
  • Companies registered in the NAICS codes 72, 14, or 00
Work breakdown
  • Project planning and design documentation
  • Site preparation and excavation
  • Material procurement and delivery
  • Construction of the retaining wall
  • Final inspection and project handover
Response package checklist
  • Completed bid form
  • Company qualifications
  • References from similar projects
  • Cost estimate and financial bid
  • Proof of insurance and bonding
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Bidders must comply with local regulations and building codes
  • All submissions must meet electronic bidding standards
  • Verification of company credentials is required
Pricing strategy
  • Consider competitive pricing aligned with similar regional projects
  • Include contingencies for potential site challenges
  • Review historical bid amounts for similar projects in the area
Teaming and subs
  • Consider partnering with local subcontractors for specific tasks
  • Build a team experienced in bid preparation and project execution
  • Utilize consultants for specific regulatory compliance needs
Risks and watchouts
  • Potential delays in project approval processes
  • Local weather conditions during construction phase
  • Risk of steel and material price fluctuations prior to bidding
Smart questions to ask
  • What are the specific materials and techniques required for the retaining wall construction?
  • Are there any environmental constraints or permits required for this project?
  • What is the anticipated timeline for project completion and payment milestones?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific period of performance provided
  • No detailed scope of work outlined
  • Contact information for PFD Bid Counter lacks a physical address
  • No pre-bid meeting date mentioned
  • Lack of detailed project specifications available online
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1142-PFD01-PFD01-128219
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.