IFB 2026-346 55 HEARD STREET BASEMENT SLAB REPLACEMENT
Federal opportunity from 1145CONVD - Purchasing • City of Chelsea. Place of performance: MA. Response deadline: Mar 12, 2026. Industry: Source industry codes 72, 15, 27.
- Source
- Open on official portal →
- Solicitation
- BD-26-1145-1145C-1145L-125858
- Performance
- Chelsea, MA 02150
- Response
- Mar 12, 2026, 11:00 AM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 22 more rate previews.↓
Description
Starting 2/26/26, by visiting the City of Chelsea's website at: https://www.chelseama.gov/departments/purchasing/current_bids___solicitations.php
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The City of Chelsea is issuing an Invitation for Bids (IFB) for the basement slab replacement at 55 Heard Street. Bids are due by March 12, 2026, making this a medium-term opportunity for contractors specializing in flooring and concrete work. Details regarding the bidding process will be available starting February 26, 2026, on the City of Chelsea's purchasing website.
The City of Chelsea aims to replace the basement slab of a building located at 55 Heard Street, improving structural integrity and safety.
- Contractors experienced in concrete work
- Companies with previous government contract experience
- Local contractors familiar with the Chelsea area
- Conduct site assessment
- Prepare materials and labor estimates
- Complete basement slab replacement
- Perform quality assurance inspections
- Business License
- Proof of insurance
- Bid proposal
- Previous project references
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with local building codes
- Adhere to safety regulations during construction
- Consider competitive pricing due to potential local competition.
- Factor in material costs and labor rates
- Partner with local material suppliers for cost efficiency.
- Team with licensed subcontractors skilled in concrete work.
- Potential for project delays due to weather conditions.
- Inaccurate estimates of material needs could inflate costs.
- What are the specific requirements for the slab replacement materials?
- Are there existing structural issues we need to be aware of before bidding?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific details on current building conditions.
- Lack of information on mandatory bonding requirements.
- Absence of attachments or additional project specifications.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.