Skip to content
City of Gardner

2026-038 Line Painting and Pavement Marking

Solicitation: BD-26-1441-COG01-COG01-129000
Notice ID: ma_commbuys_9c9fc8d429624d053457
DepartmentCity of GardnerStateMAPostedDueMay 27, 2026, 03:00 PM UTCCloses in 1 daysBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from City of Gardner. Place of performance: MA. Response deadline: May 27, 2026.

Source
Open on official portal →
Solicitation
BD-26-1441-COG01-COG01-129000
Performance
MA
Response
May 27, 2026, 03:00 PM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
Joshua Cormier
Email
Not available
Phone
Not available

Agency & Office

Department
City of Gardner
Agency
Not available
Subagency
Not available
Office
Joshua Cormier
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

2026-038 Line Painting and Pavement Marking

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: May 24, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The City of Gardner is seeking contractors for the Line Painting and Pavement Marking project, identified as 2026-038, with a response deadline set for May 27, 2026. This opportunity is critical for maintaining roadway safety and enhancing traffic management. Bidders should prepare to provide detailed proposals that demonstrate their capability in executing line painting and pavement marking services.

line paintingpavement markingroad safetymunicipal contractstraffic management
What the buyer is trying to do

The City aims to enhance road safety and visibility through professional line painting and pavement marking services, critical for effective traffic flow and compliance with safety standards.

Who should pursue this
  • Contractors with experience in roadway maintenance
  • Businesses specializing in painting and marking services
  • Firms with a strong safety record
Work breakdown
  • Detailing existing road conditions
  • Preparing surfaces for painting
  • Applying paint and pavement markings according to specifications
  • Conducting quality assurance checks post-application
Response package checklist
  • Cover letter expressing intent to bid
  • Detailed proposal outlining methodology and timelines
  • Certificates of insurance and bonding information
  • Previous project references
  • Bid pricing sheet
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • All work must comply with local traffic regulations
  • Adherence to any specified material standards
Pricing strategy
  • Consider competitive pricing while ensuring quality materials and labor
  • Evaluate historical data on similar projects in the area for pricing benchmarks
Teaming and subs
  • Subcontract with local suppliers for materials
  • Partner with firms experienced in traffic control during the job
Risks and watchouts
  • Weather conditions may impact project timelines
  • Potential for project scope changes leading to budget adjustments
Smart questions to ask
  • What specific materials are preferred for the pavement markings?
  • Are there any road usage restrictions during the project period?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific requirements for paint types and materials
  • Detailed specifications for roadway conditions
  • Expectations for project milestones and reporting
  • Information on potential penalties for non-compliance
  • Clarification on local regulations affecting work hours
  • Potential for project to extend beyond initial timeline
  • Details on funding availability and budget limits
  • Profile of typical bidders for similar past projects
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1441-COG01-COG01-129000
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.