2026-041 Greenwood Pavilion Project
Federal opportunity from City of Gardner. Place of performance: MA. Response deadline: Jun 04, 2026.
- Source
- Open on official portal →
- Solicitation
- BD-26-1441-COG01-COG01-129058
- Performance
- MA
- Response
- Jun 04, 2026, 03:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 22 more rate previews.↓
Description
2026-041 Greenwood Pavilion Project
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The 2026-041 Greenwood Pavilion Project involves comprehensive construction tasks, including the removal of existing concrete and site grading. Bidders are required to furnish all labor, equipment, and materials necessary to construct a new wood-framed pavilion, with specific tasks including concrete pad installation and accessibility features like a wheelchair ramp.
The buyer seeks to engage contractors who can successfully execute the construction of the Greenwood Pool Pavilion, ensuring compliance with municipal standards and project specifications.
- Contractors with experience in park and recreation facility construction
- Firms specializing in site grading and concrete work
- Removal and disposal of existing concrete sidewalk and walkway
- Site grading
- Construction of new wood-framed pavilion
- Concrete pad installation
- Sidewalk construction
- Planting and landscaping
- Wheelchair ramp construction
- Curbing and incidental tasks
- Completed bid proposal form
- Proof of similar project experience
- Project timeline and milestones
- Cost breakdown
- Safety management plan
- References from previous clients
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Mandatory compliance with local building codes
- Adherence to environmental regulations related to site work
- Requirements for accessibility features as per ADA guidelines
- Consider a competitive yet sustainable pricing approach reflecting labor and materials costs
- Evaluate pricing against historical data for similar projects
- Consider partnering with local subcontractors for landscaping and concrete work
- Involve a safety expert to enhance the safety plan provided in the proposal
- Potential delays in site preparation due to unforeseen weather conditions
- Risk of cost overruns if material prices increase before contract execution
- What is the anticipated timeline for project approval following bid submission?
- Are there specific local permits or approvals required that bidders should be aware of?
- What is the budget range allocated for this project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed project budget
- Exact location of the project site
- Information regarding local workforce availability
- Specific permit requirements
- Clarification on site conditions prior to bid
- Deadline for questions from bidders
- Contact information for project manager
- Stakeholder engagement process
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.