Skip to content
City of Gardner

2026-041 Greenwood Pavilion Project

Solicitation: BD-26-1441-COG01-COG01-129058
Notice ID: ma_commbuys_e30ced5168cb8a8991ae
DepartmentCity of GardnerStateMAPostedDueJun 04, 2026, 03:00 PM UTCCloses in 9 daysBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from City of Gardner. Place of performance: MA. Response deadline: Jun 04, 2026.

Source
Open on official portal →
Solicitation
BD-26-1441-COG01-COG01-129058
Performance
MA
Response
Jun 04, 2026, 03:00 PM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
Joshua Cormier
Email
Not available
Phone
Not available

Agency & Office

Department
City of Gardner
Agency
Not available
Subagency
Not available
Office
Joshua Cormier
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

2026-041 Greenwood Pavilion Project

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: May 18, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The 2026-041 Greenwood Pavilion Project involves comprehensive construction tasks, including the removal of existing concrete and site grading. Bidders are required to furnish all labor, equipment, and materials necessary to construct a new wood-framed pavilion, with specific tasks including concrete pad installation and accessibility features like a wheelchair ramp.

Greenwood Pavilionconstructionsite gradingwood framedpublic worksconcrete installation
What the buyer is trying to do

The buyer seeks to engage contractors who can successfully execute the construction of the Greenwood Pool Pavilion, ensuring compliance with municipal standards and project specifications.

Who should pursue this
  • Contractors with experience in park and recreation facility construction
  • Firms specializing in site grading and concrete work
Work breakdown
  • Removal and disposal of existing concrete sidewalk and walkway
  • Site grading
  • Construction of new wood-framed pavilion
  • Concrete pad installation
  • Sidewalk construction
  • Planting and landscaping
  • Wheelchair ramp construction
  • Curbing and incidental tasks
Response package checklist
  • Completed bid proposal form
  • Proof of similar project experience
  • Project timeline and milestones
  • Cost breakdown
  • Safety management plan
  • References from previous clients
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Mandatory compliance with local building codes
  • Adherence to environmental regulations related to site work
  • Requirements for accessibility features as per ADA guidelines
Pricing strategy
  • Consider a competitive yet sustainable pricing approach reflecting labor and materials costs
  • Evaluate pricing against historical data for similar projects
Teaming and subs
  • Consider partnering with local subcontractors for landscaping and concrete work
  • Involve a safety expert to enhance the safety plan provided in the proposal
Risks and watchouts
  • Potential delays in site preparation due to unforeseen weather conditions
  • Risk of cost overruns if material prices increase before contract execution
Smart questions to ask
  • What is the anticipated timeline for project approval following bid submission?
  • Are there specific local permits or approvals required that bidders should be aware of?
  • What is the budget range allocated for this project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed project budget
  • Exact location of the project site
  • Information regarding local workforce availability
  • Specific permit requirements
  • Clarification on site conditions prior to bid
  • Deadline for questions from bidders
  • Contact information for project manager
  • Stakeholder engagement process
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1441-COG01-COG01-129058
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.