City of Haverhill

Little River Dam Removal and River Restoration

Solicitation: BD-26-1279-1279C-COH01-128000
Notice ID: ma_commbuys_22698d05dd8419277a0f
Source codes72, 14, 00DepartmentCity of HaverhillAgency1279COH01 - Purchasing DeptStateMAPostedApr 15, 2026, 08:00 AM UTCDueMay 13, 2026, 03:00 PM UTCExpiredBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from 1279COH01 - Purchasing Dept. • City of Haverhill. Place of performance: MA. Response deadline: May 13, 2026. Industry: Source industry codes 72, 14, 00.

Source
Open on official portal →
Solicitation
BD-26-1279-1279C-COH01-128000
Performance
Summer Street Haverhill, MA 01830
Response
May 13, 2026, 03:00 PM UTC
Open on official portal →
Map for MA
Live POP
Place of performance
Summer Street Haverhill, MA 01830
State: MA
Contracting office
Steve Bucuzzo 4 Summer Street Haverhill, MA 01830 US

Point of Contact

Name
Steven S. Bucuzzo
Email
Not available
Phone
Not available

Agency & Office

Department
City of Haverhill
Agency
1279COH01 - Purchasing Dept.
Subagency
1279COH01 - Purchasing Dept.
Office
COH01 - City Hall
Contracting Office Address
Steve Bucuzzo 4 Summer Street Haverhill, MA 01830 US

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260018 (Rev 1)
Published May 18, 2026Massachusetts • Essex
24 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 22 more rate previews.
Davis-BaconBest fitstate match
MA20260018 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Essex
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260023 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Plymouth
Rate
CARPENTER (INCLUDES FORM WORK)
Base $50.10Fringe $31.45
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER (GUARDRAIL/FENCES)
Base $57.83Fringe $33.70
+23 more occupation rates in this WD
Davis-Baconstate match
MA20260017 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Bristol
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260006 (Rev 2)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Berkshire, Bristol +11
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD

Description

Bidding documents may be obtained electronically at www.projectdog.com (Project Code #873965).

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,515,334,796
Sector total $3,515,334,796 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,216$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,515,334,796)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 16, 2026
Client-ready brief
Executive summary
medium confidencegpt 5.2

The Purchasing Dept. (agency code 1279COH01) is soliciting bids for the “Little River Dam Removal and River Restoration” effort, with responses due by 2026-05-13 15:00 UTC. The only access path provided is via ProjectDog (Project Code #873965), where the bidding documents can be obtained electronically. Because the notice text contains no scope, specs, or administrative terms, the bid/no-bid decision hinges on retrieving and reviewing the ProjectDog package immediately. Treat this as a construction/environmental restoration procurement until the documents confirm exact work elements, permitting, and contracting requirements.

Little Riverdam removalriver restorationProjectDog 873965Purchasing Dept. 1279COH01source codes 72, 14, 00
What the buyer is trying to do

Procure a contractor to remove the Little River dam and perform river restoration work, using the full bidding documents distributed through ProjectDog (Project Code #873965).

Who should pursue this
  • Civil/heavy contractors with dam removal experience and river/stream restoration execution capability.
  • Firms that are already registered and able to pull documents and submit through the ProjectDog workflow tied to Project Code #873965.
  • Contractors with demonstrated environmental construction controls (erosion/sediment control) and ability to manage disposal/logistics typical of dam removal projects (confirm specifics in the package).
Work breakdown
  • Download and review complete bid package from ProjectDog (Project Code #873965) for scope, plans/specs, bid form, and instructions.
  • Dam deconstruction/removal per plans (methods, sequencing, disposal) as defined in the bid documents.
  • River channel and habitat restoration work as specified (e.g., grading, bank stabilization, sediment management) per package requirements.
  • Environmental compliance and permitting deliverables (only if required in the bid package).
  • Construction management: schedule, submittals, QA/QC, and closeout per the bid documents.
Response package checklist
  • Obtain and comply with all bid forms and instructions contained in ProjectDog package (Project Code #873965).
  • Completed price proposal as required by the bid form(s) in the package (unit prices/lump sum/alternates as applicable).
  • Acknowledgment of addenda (if any) issued via ProjectDog.
  • Required bid security/bonding documents if specified in the bid package.
  • Required contractor qualifications, references, and certifications exactly as requested in the package.
  • Schedule/approach narrative only if the bid instructions require it.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Response deadline is 2026-05-13 15:00 UTC; confirm local time and submission method in the ProjectDog documents.
  • All official requirements appear to be contained in the ProjectDog bidding documents (Project Code #873965); the notice itself does not provide contractual/administrative terms.
  • NAICS listed as ["72","14","00"] is ambiguous/non-standard as presented; rely on the bid package for applicable codes and compliance requirements.
Pricing strategy
  • Do not commit to pricing structure until the ProjectDog bid form is reviewed (unit-price vs lump-sum vs alternates).
  • Identify major cost drivers from the documents (demolition/removal methods, material disposal, dewatering/diversion, sediment handling, restoration materials) and price risk explicitly where allowed by the bid form.
  • Confirm whether there are bid alternates (common in removal/restoration) and align subcontractor quotes to the exact bid schedule lines.
Teaming and subs
  • Environmental controls subcontractor (erosion & sediment control installation/maintenance) if not self-performed.
  • Trucking/disposal subcontractor(s) if the package specifies offsite disposal requirements for demolition debris/sediment.
  • Specialty restoration subs (planting/streambank stabilization) if restoration elements require it—confirm in the ProjectDog plans/specs.
Risks and watchouts
  • Insufficient notice detail: scope, site conditions, permitting responsibilities, and bid forms are unknown until the ProjectDog package is downloaded.
  • Schedule risk: with a fixed bid deadline (2026-05-13 15:00 UTC), delays in accessing ProjectDog documents or clarifying addenda could compress estimating time.
  • Regulatory/constructability risk typical of dam removal/river work (work windows, flow conditions) may be embedded in specs—must be identified early from the documents.
Smart questions to ask
  • Are all plan sheets, technical specifications, and geotechnical/hydrology reports (if any) included in ProjectDog Project Code #873965?
  • What is the required bid form structure (unit price/lump sum/alternates) and are there mandatory allowances/contingencies?
  • What permits are already obtained by the owner vs required from the contractor, and what environmental work windows apply (as stated in the documents)?
  • What are the bid security and performance/payment bond requirements (if any) per the ProjectDog instructions?
  • Where is the place of performance/site location and are there mandatory site visits or pre-bid meetings listed in the package?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Bid package contents (scope, drawings/specs, bid form, submission instructions) from ProjectDog Project Code #873965
  • Place of performance/site location and access constraints
  • Solicitation number and notice type
  • PSC and correct NAICS/set-aside information
  • Pre-bid meeting/site walk details and Q&A/addenda process
  • Contract type, bonding/insurance requirements, and bid security
  • Period of performance and schedule milestones
  • Permitting responsibilities, environmental constraints, and work windows
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1279-1279C-COH01-128000
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.