IFB #26300055 Carney Academy Elementary Roof Replacement-FSB
Federal opportunity from 00138 - Purchasing • City of New Bedford. Place of performance: MA. Response deadline: Feb 25, 2026. Industry: Source industry codes 72, 10, 23, 15, 11, 12, 22.
- Source
- Open on official portal →
- Solicitation
- BD-24-1157-00138-COB01-125100
- Performance
- New Bedford, MA 02740
- Response
- Feb 25, 2026, 02:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 22 more rate previews.↓
Description
IFB #26300055 Carney Academy Elementary Roof Replacement-FSB
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity is for the IFB #26300055 Carney Academy Elementary Roof Replacement, issued by the Purchasing agency. The response deadline is set for February 25, 2026, making this a significant project for interested bidders. Relevant NAICS codes include various classifications under construction and roofing, indicating a need for specialized contractors in this field.
The buyer is seeking qualified contractors to replace the roof at Carney Academy Elementary, ensuring the facility meets safety and operational standards.
- Roofing contractors with experience in educational facilities
- General contractors with roofing capabilities
- Companies with relevant licenses and insurance for construction work
- Site assessment and evaluation of the current roof
- Removal and disposal of existing roofing materials
- Installation of new roofing system conforming to specifications
- Post-installation inspection and quality assurance
- Bid proposal with pricing detail
- Company qualifications and past project references
- Proof of relevant licensing and insurance
- Detailed timeline and work schedule
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Bidders must comply with local construction codes
- Adherence to safety regulations during construction
- Consider competitive pricing due to potential interest from multiple contractors
- Include detailed cost breakdown to reflect transparency and competitiveness
- Roofing specialists for technical expertise
- Local suppliers for roofing materials
- General contractors for overall project management
- Potential supply chain delays for roofing materials
- Weather conditions affecting construction timelines
- Compliance with local regulations and codes
- What are the specific roofing materials required?
- Are there any particular safety protocols mandated by the school district?
- What is the anticipated timeline for the entire project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific performance period defined
- Lack of detailed specifications for roofing materials
- No indication of budget or funding sources
- Absence of site visit information
- No contact details for buyer
- No insights into previous roofing projects
- Requirement for minority or small business participation unclear
- No links to support documents or attachments
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.