IFB 26-19 Argenziano School Boiler Replacement
Federal opportunity from COS01 - Procurement & Contracting Services • City of Somerville. Place of performance: MA. Response deadline: Jul 08, 2026. Industry: Source industry codes 72, 13, 00.
- Source
- Open on official portal →
- Solicitation
- BD-26-1166-COS01-COS01-130686
- Performance
- Highland Ave Somerville, MA 02143
- Response
- Jul 08, 2026, 03:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 23 more rate previews.↓
Description
Filed Sub Bids are due at 3pm EST on 7/1/2026. DCAMM Certifications required for General Bidders (General Building Construction) and Filed Sub-bidders (HVAC and Electric)
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The IFB 26-19 Argenziano School Boiler Replacement project, managed by COS01 - Procurement & Contracting Services, will require responses by July 8, 2026. Bidders must submit Filed Sub Bids by 3 p.m. EST on July 1, 2026, and must hold DCAMM Certifications for General Bidders and Filed Sub-bidders. This project involves significant HVAC and electrical work alongside general construction undertakings.
The buyer is looking for capable contractors to replace the boiler at Argenziano School, ensuring compliance with DCAMM certifications and relevant construction standards.
- General Contractors with DCAMM Certification
- HVAC Contractors with DCAMM Certification
- Electrical Contractors with DCAMM Certification
- General Building Construction
- HVAC System Installation
- Electrical Work
- DCAMM Certification documentation
- Detailed cost estimates
- Project timeline
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- All bidders must comply with DCAMM Certification requirements
- Submission deadlines are strict and non-negotiable
- Consider competitive pricing due to potential multiple bids
- Include contingencies for unforeseen issues during installation
- General Contractors might need to pair with HVAC and Electrical subcontractors for compliance
- Explore opportunities with local firms to enhance local expertise
- Risks of non-compliance with DCAMM certification could disqualify bids
- Tight deadline for sub-bids may pressure response quality
- Potential supply chain issues affecting HVAC components
- What specific requirements are outlined under DCAMM certifications?
- Is there a pre-bid meeting scheduled to clarify project needs?
- Are there existing plans or specifications for the boiler being replaced?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed scope of boiler specifications
- Current boiler condition or specifications
- Project budget details
- Pre-bid meeting information
- Contact person for clarification
- Site visit availability after bid announcement
- List of potential competitors
- Timeline for contract award
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.