Schoolmaster Lane Water Main Project
Federal opportunity from DWWD4 - distribution • Dedham Westwood Water District. Place of performance: MA. Response deadline: May 14, 2026. Industry: Source industry codes 83, 10, 00.
- Source
- Open on official portal →
- Solicitation
- BD-26-1986-DWWD1-DWWD1-128284
- Performance
- elm street dedham, MA 02026
- Response
- May 14, 2026, 02:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 22 more rate previews.↓
Description
The work consists of installation of approximately 1,325 linear feet of 8-inch ductile iron pipe, on Schoolmaster Lane in Dedham. The project will run from 100 Schoolmaster Lane to Country Club Road connecting to existing water mains at each end. Work also includes an above grade pier supported culvert crossing including but not limited to 18-inch steel casing pipe, concrete piers, pre-insulated 8-inch ductile iron pipe, and other ancillary items.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Service match
Optional support routes matched to this notice after the core solicitation details.
Other matched support routes↓
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.