DFW-2026-053 Maple Springs - Camp Chachelot Firebreak Imrpovements
Federal opportunity from DFW - Division of Fisheries and Wildlife • Department of Fish and Game. Place of performance: MA. Response deadline: Mar 10, 2026. Industry: Source industry codes 70, 15, 00.
- Source
- Open on official portal →
- Solicitation
- BD-26-1046-DFW-FW104-125559
- Performance
- James Burnham Wesborough, MA 01581-3337
- Response
- Mar 10, 2026, 10:00 AM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 88 more rate previews.↓
Description
Firebreak improvements and construction at Camp Cachelot and Maple Springs WMAs in Wareham/Plymouth, MA. Treatments will include removing all trees, stumps, and woody vegetation greater than 1 inch in diameter, followed by grading, within the identified firebreak footprint in accordance with the treatment specifications section below.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The DFW is soliciting bids for firebreak improvements at Camp Cachelot and Maple Springs WMAs in Wareham/Plymouth, MA. The project involves removing trees, stumps, and woody vegetation exceeding 1 inch in diameter, followed by grading within specified firebreak areas. The response deadline is set for March 6, 2026, presenting a significant opportunity for contractors experienced in land management and fire prevention measures.
The agency aims to enhance firebreaks at designated wildlife management areas to improve safety and manage wildlife habitats effectively.
- Companies specializing in land management and firebreak construction
- Environmental contractors with experience in wildlife habitat management
- Small businesses capable of handling projects of this scale
- Site assessment for firebreak areas
- Removal of trees and vegetation over 1 inch in diameter
- Grading of the firebreak footprint according to specified specifications
- Post-construction site restoration
- Company background and experience
- Detailed project plan and timeline
- Pricing proposal
- Safety and environmental compliance statements
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure adherence to state and federal environmental regulations
- Document all permits and approvals regarding land clearing
- Consider competitive pricing while accounting for the labor-intensive nature of vegetation removal
- Factor in potential equipment rental costs for grading and clearing
- Partner with local environmental consultants for compliance assurance
- Engage subcontractors with expertise in land clearing to augment capability
- Potential delays due to environmental assessments and permits
- Weather conditions affecting the schedule for land clearing and grading
- Non-compliance with environmental regulations leading to penalties
- What specific environmental regulations must be adhered to in this project?
- Are there any specific timelines or milestones set by DFW for project completion?
- What is the scope for ongoing maintenance after firebreak improvements are made?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific dollar amount for the project
- Lack of detailed treatment specifications
- Absence of mandatory bidding requirements or licenses
- No clear details on previous projects or benchmarks
- Uncertainty about local subcontractor availability
- No community stakeholder engagement requirements shown
Service match
Optional support routes matched to this notice after the core solicitation details.
Other matched support routes↓
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.