DFW-2026-059 Century Bog Restoration Project
Federal opportunity from DFW - Division of Fisheries and Wildlife • Department of Fish and Game. Place of performance: MA. Response deadline: Mar 27, 2026. Industry: Source industry codes 70, 13, 17.
- Source
- Open on official portal →
- Solicitation
- BD-26-1046-DFW-FW104-125752
- Performance
- Lori Cookman Westborough, MA 01581-3337
- Response
- Mar 27, 2026, 11:00 AM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 5 more rate previews.↓
Description
This project consists of river and peat bog restoration of Century Bog in Wareham/Plymouth MA in accordance with attached project manual and construction plans.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The DFW-2026-059 Century Bog Restoration Project aims to restore the Century Bog located in Wareham/Plymouth, MA. This initiative involves river and peat bog restoration per the provided construction plans and project manual. Interested bidders should note that this opportunity is not set aside for small businesses under the SBPP program and the response deadline is March 27, 2026.
The buyer is seeking qualified contractors to perform river and peat bog restoration at Century Bog, which is critical for environmental conservation and habitat restoration efforts in the region.
- Environmental restoration firms
- Contractors with experience in wetland restoration
- Companies familiar with Massachusetts environmental regulations
- Review attached project manual and construction plans
- Conduct environmental assessments
- Execute river and peat bog restoration activities
- Prepare and submit progress reports to DFW
- Completed response form
- Qualifications and experience documents
- Project approach and methodology
- Pricing proposal
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with Massachusetts environmental laws
- Follow safety regulations during restoration activities
- Consider state funding limitations and average costs for environmental restoration projects
- Include contingencies for unanticipated site conditions
- Partner with local environmental consultants
- Engage subcontractors with specialized skills in aquatic restoration
- Potential delays due to regulatory approvals
- Environmental unforeseen conditions may increase costs
- Difficulty in mobilizing specialized equipment in sensitive areas
- What are the specific environmental permits required for this project?
- Are there any specific local regulations that may impact the project timeline?
- Can site visits be arranged prior to the proposal submission?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Clarification on specific deliverables within the project manual
- Any recent environmental assessments of Century Bog
- Funding availability for the project
- List of mandatory certifications required for bidders
- Response format requirements for submissions
- Information on previous contractors for similar work
- Details on performance measurements and success criteria
- Timeline for on-site preparation and mobilization
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.